| Plan Review Notes For Permit 20030099 |
| Permit Number |
20030099 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-04-22 11:10:08 | 1) INDICATE ON THE PLAN WHAT TYPE OF LIQUID WASTE WILL | | | BE DISCHARGED INTO THE TRENCH DRAIN. IF THERE IS A | | | POSSIBILITY OF ANY OF THE LIQUID WASTE FROM THE TRASH | | | COMPACTOR DISCHARGING INTO THE TRENCH DRAIN, THEN THE | | | TRENCH DRAIN MUST DISCHARGE TO THE OIL INTERCEPTOR AND | | | NOT TO THE STORM DRAINAGE SYSTEM. 2017 FBC-PLUMBING | | | SEC.1003.1, 1003.4.1. | | | 2) THE SAMPLING PORTS ARE REQUIRED TO BE 4 INCHES IN | | | DIAMETER WHICH WOULD ALSO REQUIRE THE DRAIN FROM THE | | | INTERCEPTORS TO BE 4 INCHES IN DIAMETER. A FOUR INCH | | | SAMPLING PORT AND DRAIN IS REQUIRED SO THE CITY OF WEST | | | PALM BEACH UTILITIES DEPARTMENT HAS AMPLE ROOM FOR | | | THEIR EQUIPMENT TO TAKE SAMPLES. | | | 3) THE OIL SEPARATOR SHALL HAVE A DEPTH OF NOT LESS | | | THAN 2 FEET BELOW THE INVERT OF THE DISCHARGE DRAIN PER | | | 2017 FBC SEC. 1003.4.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|