Plan Review Notes
Plan Review Notes For Permit 20030099
Permit Number 20030099
Review Stop P
Sequence Number 1
Notes
Date Text
2020-04-22 11:10:081) INDICATE ON THE PLAN WHAT TYPE OF LIQUID WASTE WILL
 BE DISCHARGED INTO THE TRENCH DRAIN. IF THERE IS A
 POSSIBILITY OF ANY OF THE LIQUID WASTE FROM THE TRASH
 COMPACTOR DISCHARGING INTO THE TRENCH DRAIN, THEN THE
 TRENCH DRAIN MUST DISCHARGE TO THE OIL INTERCEPTOR AND
 NOT TO THE STORM DRAINAGE SYSTEM. 2017 FBC-PLUMBING
 SEC.1003.1, 1003.4.1.
 2) THE SAMPLING PORTS ARE REQUIRED TO BE 4 INCHES IN
 DIAMETER WHICH WOULD ALSO REQUIRE THE DRAIN FROM THE
 INTERCEPTORS TO BE 4 INCHES IN DIAMETER. A FOUR INCH
 SAMPLING PORT AND DRAIN IS REQUIRED SO THE CITY OF WEST
 PALM BEACH UTILITIES DEPARTMENT HAS AMPLE ROOM FOR
 THEIR EQUIPMENT TO TAKE SAMPLES.
 3) THE OIL SEPARATOR SHALL HAVE A DEPTH OF NOT LESS
 THAN 2 FEET BELOW THE INVERT OF THE DISCHARGE DRAIN PER
 2017 FBC SEC. 1003.4.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  