| 2020-02-21 18:46:38 | 02/21/2020 PLUMBING 1ST REVIEW **DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A BUILDING PERMIT, MECHANICAL PERMIT AND GAS PERMIT |
| | IS REQUIRED FOR BY A LICENSED CONTRACTOR PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 105.1. |
| | 2. THE SCOPE OF WORK REQUIRES PLAN OF BEFORE AND AFTER |
| | ALL TRADES, IN THE EXAMINATION OF THE DOCUMENTS BY THE |
| | BUILDING OFFICIAL SHALL INCLUDE THE FOLLOWING MINIMUM |
| | CRITERIA AND DOCUMENTS: A FLOOR PLAN; SITE PLAN; |
| | FOUNDATION PLAN; FLOOR/ROOF FRAMING PLAN OR TRUSS |
| | LAYOUT; ALL FENESTRATION PENETRATIONS; FLASHING; AND |
| | ROUGH OPENING DIMENSIONS; AND ALL EXTERIOR ELEVATIONS: |
| | FBC WPB AMENDMENTS SEC. 107.3.5 MINIMUM PLAN REVIEW |
| | CRITERIA FOR BUILDINGS. |
| | 3. PLEASE HAVE A SIGNATURE ON THE ISOMETRIC DRAWING OF |
| | THE PERSON DESIGNING THE SYSTEM, NOT IN ACCORDANCE WITH |
| | FLORIDA ADMINISTRATIVE CODE 61G15-23.001, FLORIDA |
| | STATUTE 471. WPB AMENDMENTS TO THE FBC SEC. 107.1 |
| | GENERAL. |
| | 4. WASHING MACHINE DRAIN REQUIRES A 3" LINE ON MOST |
| | MANUFACTURES RECOMMENDATION PLEASE REVISE ISOMETRIC TO |
| | REFLECT SIZE OF DRAIN LINE PER THE WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | 5. IF THE MAIN DRAIN LINE TO CITY WILL IT BE CHANGE TO |
| | PVC AND IF SO PLEASE CLARIFY ON PLANS AND SHOW TWO |
| | CLEAN OUTS, ONE AT THE EXIT OF BUILDING AND ONE NET IN |
| | FROM OF TAP (IF NOT ONE THERE FROM CITY LATERAL) PER |
| | THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION |
| | ON CONSTRUCTION DOCUMENTS. |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |