2020-02-21 18:49:3202/21/2020 1ST GAS REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ON THE GAS ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC RES.
 SECS. G2413.4.1, G2413.4.2.
 2. SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE
 DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR
 ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS
 SYSTEM PER THE 2017 FBC FG SEC. 402.3 OR 2017 FBC RES.
 SEC. G2413.3.
 3. PLEASE SHOW TYPE OF GAS (LP OR NATURAL) PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
 4. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC
 RES. SEC. G2413.4.1
 5. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE AND UNION SHALL BE INSTALLED
 IMMEDIATELY AHEAD OF EACH MP REGULATOR PER THE 2017 FBC
 RES. SEC. G2420.4.
 6. THERE IS NO DRYER SHOWN ON PLANS OF ELECTRICAL AND
 IF THE DRYER A GAS TYPE PLEASE CLARIFY PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
 7. SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS
 APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR PER THE 2017
 FBC RES. SEC. G2407.9.3. COMBINED COMBUSTION AIR AND
 VENTILATION AIR SYSTEM.
 8. IF USING METAL LOUVER, PLEASE SHOW THE LOCATION OF
 THE METAL LOUVERS THAT ARE BEING INSTALLED FOR THE
 COMBUSTION AIR. THE LOUVERS CANNOT BE LOCATED ON AN
 EXTERIOR WALL THAT IS FIRE RATED AS THE FIRE RATING OF
 THE WALL MUST BE MAINTAINED PER THE WPB AMENDMENTS TO
 FBC SEC.107.2.1.
 9. THE PLANS INDICATE A TANKLESS WATER HEATER AND IT IS
 NOT THE ONLY GAS APPLIANCE IN THIS SYSTEM? SUBMIT A
 COMPLETE GAS RISER SHOWING ALL PIPE SIZES, TYPE OF
 PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET,
 THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM,
 THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM.
 THESE REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM. WPB
 AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL
 GAS
 10. PLEASE NOTE THERE IS NOT A PERMIT ON FILE FOR
 EXISTING GAS AND IF NOT TO CODE IT MAY REQUIRE TO BE
 BOUGHT UP TO CODE AT OWNER EXPENSE WITH A NEW PERMIT
 AND REVIEW.
 11. THIS TANKLESS UNIT CALL FOR 10.5" WATER COLUMN AND
 THE SERVICE METER DISCHARGES IS A 12" WATER COLUMN
 REQUIRING A REGULATOR FOR THIS UNIT AS PER
 MANUFACTURER'S SPECIFICATION. SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS
 INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE
 APPROVED FOR OUTDOOR INSTALLATION PER THE 2017 FBC RES.
 SEC. G2421.1.
 12. SUBMIT MANUFACTURER'S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC RES. SEC. G2408.1.
 13. ALL GAS AS APPLIANCES SHALL BE LISTED AND LABELED.
 THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES/EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION PER THE 2017 FBC RES. SEC. G2413.2 AND
 G2404.3.
 14. THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES
 PER THE 2017 FBC RES. SECS. G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3.
 15. SHOW THE RELOCATION OF WATER HEATER, SUBMIT TWO
 COPIES OF A HOUSE PLAN SHOWING THE LOCATION OF THE
 TANKLESS WATER HEATER AND THE LOCATION AND DISTANCE OF
 ANY OPERABLE DOORS OR WINDOWS IN RELATION TO THE WATER
 HEATER. THE LOCATION OF THE WATER HEATER SHALL COMPLY
 WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS PER
 THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION
 ON CONSTRUCTION DOCUMENTS.
 16. PLEASE HAVE A SIGNATURE ON THE ISOMETRIC DRAWING OF
 THE PERSON DESIGNING THE SYSTEM, NOT IN ACCORDANCE WITH
 FLORIDA ADMINISTRATIVE CODE 61G15-23.001, FLORIDA
 STATUTE 471. WPB AMENDMENTS TO THE FBC SEC. 107.1
 GENERAL.
  
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM