| Date |
Text |
| 2020-02-19 10:23:44 | 2/19/2020 1ST GAS REVIEW**DENIED** WITH COMMENTS NOTE - |
| | A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME |
| | AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED |
| | UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1-GAS REGULATOR BOX- PLEASE PROVIDE WHETHER THE |
| | REGULATOR BOX WILL BE SUBJECT TO TRAFFIC |
| | |
| | 2-GAS REGULATOR- PLEASE PROVIDE DOCUMENTATION CLEARLY |
| | INDICATING THAT THE GAS REGULATOR IS APPROVED TO BE |
| | INSTALLED IN A METER BOX BELOW GRADE AND THAT THE |
| | RELIEF OPENING WILL NOT BE SUBJECT TO INSECTS, WATER |
| | AND FOREIGN MATERIAL |
| | |
| | 3- THERE IS AN APPROVED CITY PLAN PERMIT #19020469 |
| | INDICATING THAT THERE IS A GAS WATER HEATER AND RANGE |
| | BEING INSTALLED IN THE HOME, PLEASE CLARIFY THESE |
| | FIXTURES THAT ARE NOT LISTED ON THE PROVIDED GAS |
| | ISOMETRIC |
| | |
| | 4-TOTAL JOB COST SEEMS LOW. THE VALUE MUST INCLUDE THE |
| | COST OF ALL EQUIPMENT INCLUDING TIKI TORCHES, BBQ GRILL |
| | AND STOVE. PROVIDE BONA FIDE SIGNED CONTRACT PER WPB |
| | AMENDMENTS TO THE FBC 109.3 |
| | |
| | 5-GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL |
| | GAS SEC. 402.2 AND 301.3 OR 2017 FBC FUEL GAS RES. SEC. |
| | G2413.2 AND G2404.3. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |
| | |