| 2020-02-25 17:16:38 | 02/25/2020 1ST GAS REVIEW **DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. PLEASE PROVIDE A VALID LP LICENSE FOR A CONTRACTOR |
| | OF THE WORK BEING DONE AND PULL A SUB PERMIT FOR THE |
| | WORK BEING DONE PER THE 2017 FBC WPB A 105.1. |
| | |
| | 2. GAS RISER DIAGRAM REQUIRED WPB AMENDMENTS TO THE FBC |
| | SEC. 107.3.5.3 (12) RESIDENTIAL GAS. |
| | |
| | 3. ON THE GAS ISOMETRIC DRAWING CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC RES. |
| | SECS. G2413.4.1, G2413.4.2. |
| | |
| | 4. SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE |
| | DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| | OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR |
| | ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS |
| | SYSTEM PER THE 2017 FBC RES. SEC. G2413.3. |
| | |
| | 5. PLEASE SHOW TYPE OF GAS (LP OR NATURAL) PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 6. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC |
| | RES. SEC. G2413.4.1. |
| | |
| | 7. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE AND UNION SHALL BE INSTALLED |
| | IMMEDIATELY AHEAD OF EACH MP REGULATOR PER THE 2017 FBC |
| | RES. SEC. G2420.4. |
| | |
| | 8. PLEASE HAVE A SIGNATURE ON THE ISOMETRIC DRAWING OF |
| | THE PERSON DESIGNING THE SYSTEM, NOT IN ACCORDANCE WITH |
| | FLORIDA ADMINISTRATIVE CODE 61G15-23.001, FLORIDA |
| | STATUTE 471. WPB AMENDMENTS TO THE FBC SEC. 107.1 |
| | GENERAL. |
| | |
| | 9. PLEASE PROVIDE REGULATOR SPECS AND AS INSTALLED |
| | OUTDOORS IT SHALL BE DESIGNED TO BE PROTECTED SO THEIR |
| | OPERATION WILL NOT BE AFFECTED BY THE ELEMENTS. PROVIDE |
| | DOCUMENTATION FROM THE MANUFACTURER THAT THE REGULATORS |
| | ARE APPROVED FOR EXTERIOR USE. NFPA 58-11 SEC. 6.8.1.5. |
| | |
| | 10. CLEARLY SHOW THE DISTANCE OF THE TANK FROM THE |
| | EXTERIOR ADJACENT PROPERTY LINES AND DRIVEWAY, THE |
| | DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| | OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| | BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| | PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | 11. PLEASE PROVIDE HOW YOU ARE GOING TO PROTECT THIS |
| | TANK COVER FROM VEHICULAR TRAFFIC OR PARKING ABOVE IT |
| | ON GRASS |
| | |
| | 12. IT IS INDICATED THE TANK IS BELOW THE GROUND, BUT |
| | SHOW THE METHOD OF REQUIRED PROTECTION FOR THE LP TANK |
| | AND APPURTENANCES PER NFPA 58, IT SHALL BE ANCHORED PER |
| | NFPA 58 SEC.3-2.2.7 (H) PER THE WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 13. CLEARLY INDICATE ON THE TIE-DOWN SHEET IF THE LP |
| | TANK TIE-DOWN METHOD AND IF YOU ARE USING STRAPS OR |
| | CABLE, IF CABLE HOW IS IT PROTECTED FOR THE LP TANK AND |
| | APPURTENANCES PER NFPA 58. WPB AMENDMENTS TO THE FBC |
| | SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 14. PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR |
| | THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO |
| | BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC. |
| | 6.6.1.6. |
| | |
| | 15. A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER |
| | NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE |
| | MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS |
| | ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) & A |
| | NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE |
| | AMOUNT OF WATER TO ACTIVATE IT. |
| | |
| | 16. SHOW THE DEPTH OF THE CONTAINER BELOW GRADE. COMPLY |
| | WITH NFPA 58 SEC. 6.6.6.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |