| Plan Review Notes For Permit 20020470 |
| Permit Number |
20020470 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-02-25 16:09:29 | PLUMBING COMMENTS: APPROVED WITH PROVISO | | | | | | PER WPB FBC 107.2.1 AND WPB FBC 107.3.4.1, PROVIDE AS A | | | DEFERRED SUBMITTAL, A DETAIL SHOWING HOW THE ORIGINAL | | | TUB BOX VOID AND THE NEW PIPE PENETRATION WILL BE | | | FIRESAFED. IF EXISTING PIPING IS PVC THEN A UL ASSEMBLY | | | SHALL BE SUBMITTED. IF EXISTING AND NEW PENETRATION ARE | | | METAL THEN SUBMIT ON AN APPROVED FIRE RATED CONCRETE. | | | SUBMITTAL SHALL BE SUBMITTED, APPROVED AND ON SITE | | | PRIOR TO INSPECTION. PROCEED AT YOUR OWN RISK. | | | | | | THE FOLLOWING IS NOTED: | | | NO RELOCATION OF FIXTURES. RISER DIAGRAMS ARE NOT | | | REQUIRED. | | | THE TUB IN THE MASTER BATH IS BEING REPLACED WITH A | | | SHOWER STALL. THE NEW CONTROL VALVE IS BEING RELOCATED | | | TO THE OPPOSITE WALL. | | | |
|