| Plan Review Notes For Permit 20020232 |
| Permit Number |
20020232 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-04-24 14:35:26 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) DRAWING A-5 SHOWS SPRAY FOAM INSULATION - WITH A | | | CONTINOUS EVE VENT? | | | 2) DRAWING A-2 SHOWS CENTER ROOF DRAINS - DRAWING A-5 | | | SHOWS SLOPED ROOF TRUSSES - PLEASE CLARIFY. | | | 3) SOIL REPORT PROVIDED NEEDS TO BE SIGNED | | | ELECTRONICALLY BY THE ENGINEER TO BE USED IN ELECTRONIC | | | PLAN REVIEW. | | | 4) DRAWINGS AND SOIL REPORT NEED TO BE SIGNED AND | | | SEALED ELECTRONICALLY. | | | 5) NEED THE COMPLETE (FRONT PAGES AND THE INSTALLATION | | | INSTRUCTIOS) MIAMI DADE OR FLORIDA STATE PRODUCT | | | APPROVALS FOR THE ROOFING. |
|