| 2020-03-03 17:13:53 | |
| | |
| | |
| | |
| 2020-02-25 13:53:51 | 2/25/2020 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| | COMMENTS NOTE - A COMPREHENSIVE REVIEW COULD NOT BE |
| | DONE AT THIS TIME AND ADDITIONAL PLAN REVIEW COMMENTS |
| | MAY BE GENERATED UPON THE RE-REVIEW OF SUBMITTED |
| | CORRECTIONS. |
| | |
| | 1- SUBMIT DOCUMENTATION THAT THE GAS POOL HEATER MEETS |
| | THE MINIMUM REQUIRED EFFICIENCY AS REQUIRED BY THE 2017 |
| | FBC-ENERGY SEC.R403.10.4 |
| | |
| | 2- SWIMMING POOL HEAT PUMP POOL HEATERS SHALL HAVE A |
| | MINIMUM COP OF 4.0 WHEN TESTED IN ACCORDANCE WITH AHRI |
| | 1160. |
| | |
| | 3- ALL POOL HEATERS SHALL BE EQUIPPED WITH A READILY |
| | ACCESSIBLE ON-OFF SWITCH THAT IS MOUNTED OUTSIDE THE |
| | HEATER TO ALLOW SHUTTING OFF THE HEATER WITHOUT |
| | ADJUSTING THE THERMOSTAT SETTING. 2017 FBC-ENERGY ? |
| | SEC. R403.10.1 |
| | |
| | 4- HEATED SWIMMING POOLS AND IN GROUND PERMANENTLY |
| | INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT |
| | COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR |
| | OTHER MEANS PROVEN TO REDUCE HEAT LOSS. 2017 FBC- |
| | ENERGY- SEC. R 403.10.3. |
| | |
| | 5- THE DYNAMIC HEAD CALCULATIONS FOR THE MAXIMUM SYSTEM |
| | FLOW DOES NOT SHOW ALL FRICTION LOSS THROUGH ALL |
| | HEATERS. WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 6- BACKFLOW PREVENTER REQUIRED PER THE CITY OF WEST |
| | PALM BEACH ORD #2853-95. A PERMIT REQUIRED BY A |
| | LICENSED CONTRACTOR AND MUST BE CERTIFIED BY UTILITIES |
| | PRIOR TO FINAL INSPECTION. A DUAL CHECK VALVE MAY BE |
| | USED IF NO POOL FILL IS INSTALLED AT THE METER AND |
| | INSTALLED BY UTILITIES WHICH DO NOT REQUIRE A PERMIT SO |
| | PLEASE CONTACT CITY OF WPB UTILITIES AT 561-822-2240 |
| | FOR FURTHER DIRECTIONS. |
| | |
| | 7- A CONTRACTOR LICENSED UNDER STATUES 489 SEPERATE |
| | PERMIT IS REQUIRED FOR THE GAS AND PLUMBING |
| | |
| | 8- SHOW THE BTU LOAD FOR THE GAS POOL HEATER. THIS |
| | VALUE MUST BE INCLUDED IN THE SIZING OF THE SYSTEM. |
| | 2017 FBC FUEL GAS SEC. 402.2 OR 2017 FBC FUEL GAS RES. |
| | SEC G2413.2 MAXIMUM GAS DEMAND |
| | |
| | 9- THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON |
| | THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| | CONTRACT AND SHALL INCLUDE DEMO OF EXISTING POOL. WPB |
| | AMENDMENTS TO THE FBC 109.3. BUILDING PERMITS |
| | VALUATIONS. |
| | |
| | 10- GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED |
| | IN THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT |
| | BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND |
| | PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE |
| | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT |
| | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE. AT |
| | THIS TIME. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLANS EXAMINER |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |