| 2020-02-05 15:32:06 | 02/05/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. ISOMETRIC DOES NOT MATCH THE LAYOUT ON P1.01 AS |
| | THESE PLANS BECOME PART OF CITY ARCHIVES FOR DIRECTION |
| | AND LOCATION FOR FUTURE REMODELING OF PLUMBING |
| | FIXTURES, PLEASE TRY TO MATCH AS CLOSE AS POSSIBLE PER |
| | THE WPB AMENDMENT TO FBC SEC. 107.2.1.3 QUALITY OF |
| | BUILDING PLANS. |
| | |
| | 2. THERE ARE 2 WET VENTS ON WASHING MACHINES STACK NEED |
| | TO BE DOWNSTREAM OF THE INTERCONNECTION FROM BATHROOM |
| | GROUP PER THE 2017 FBC SEC. R 3107.2. |
| | |
| | 3. PLEASE AND CLEAN OUT WHERE REQUIRED WITH 10' FROM |
| | ENTRY TO THE BUILDING PER THE 2017 FBC SEC. R 3005.2.3 |
| | |
| | 4. IN GUESS ROOM 1 (122) ON THE WASHING MACHINE |
| | STACKABLE THE VALVES SHALL BE ACCESSIBLE PER THE 2017 |
| | FBC SEC. R 2903.9.3. |
| | |
| | 5. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 6. A SUB GAS PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |