Plan Review Notes
Plan Review Notes For Permit 20020015
Permit Number 20020015
Review Stop P
Sequence Number 1
Notes
Date Text
2020-02-05 15:32:0602/05/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ISOMETRIC DOES NOT MATCH THE LAYOUT ON P1.01 AS
 THESE PLANS BECOME PART OF CITY ARCHIVES FOR DIRECTION
 AND LOCATION FOR FUTURE REMODELING OF PLUMBING
 FIXTURES, PLEASE TRY TO MATCH AS CLOSE AS POSSIBLE PER
 THE WPB AMENDMENT TO FBC SEC. 107.2.1.3 QUALITY OF
 BUILDING PLANS.
  
 2. THERE ARE 2 WET VENTS ON WASHING MACHINES STACK NEED
 TO BE DOWNSTREAM OF THE INTERCONNECTION FROM BATHROOM
 GROUP PER THE 2017 FBC SEC. R 3107.2.
  
 3. PLEASE AND CLEAN OUT WHERE REQUIRED WITH 10' FROM
 ENTRY TO THE BUILDING PER THE 2017 FBC SEC. R 3005.2.3
  
 4. IN GUESS ROOM 1 (122) ON THE WASHING MACHINE
 STACKABLE THE VALVES SHALL BE ACCESSIBLE PER THE 2017
 FBC SEC. R 2903.9.3.
  
 5. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 6. A SUB GAS PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved