| 2020-07-21 11:43:53 | PASSED WITH PROVISOS. | | | PROVISOS | | | | | | 1) THE SAMPLING PORT FOR ALL GREASE INTERCEPTORS IS TO | | | BE LOCATED ON THE DISCHARGE SIDE OF THE UNIT PER THE | | | CITY OF WPB REQUIREMENTS. | | | 2) THE BOTTOM OF THE RACKED TANKLESS WATER HEATER UNITS | | | ON THE ROOF SHALL ALSO MEET THE CLEARANCES REQUIRED IN | | | FBC-BUILDING SEC.1510.10 AND TABLE 1510.10. | | | 3) SUBMIT AN EXPANDED DETAIL AS TO HOW THE HOT WATER | | | RETURN LINE IS CONNECTED BACK TO THE WATER SYSTEM. WPB | | | AMEND. TO FBC SEC. 107 2.1. | | | 4) SHTS. P6-01, P6-02, P6-04 - PLACE A NOTE ON THESE | | | PLANS THAT READS "SEE PLAN VIEW DRAWINGS FOR THE | | | SPECIFIC LEVELS FOR KEYNOTE LEGEND FOR THE RISERS." | | | 5) SUBMIT A CONDENSATE RISER FOR REVIEW. THE SIZING | | | SHALL COMPLY WITH FBC-PLUMBING SEC.314.2.2 & TABLE | | | 314.2.2. 2ND REQUEST. | | | 6) RIGID SUPPORT SWAY BRACING SHALL BE PROVIDED AT | | | CHANGES IN DIRECTION GREATER THAN 45 DEGREES FOR PIPE | | | SIZES 4 INCHES AND LARGER IN THE SANITARY SYSTEM PER | | | 2017 FBC-PLUMBING SEC.308.6. PROVIDE A DETAIL FOR THESE | | | SUPPORTS. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | . |
|