2020-03-13 15:22:541ST REVIEW FBC-2017 MECHANICAL
 PERMIT #20011267
 3/12/20
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SUBMIT AC COOLING AND HEATING CALCULATIONS FOR ALL
 SYSTEMS- SECTION C403.2.1 FBC EC.
  
 2) SHEET M-101A & M5-01: THE O/A VENTILATION SCHEDULE
 DOES NOT INCLUDE CALCULATIONS FOR THE GROUND FLOOR
 LOBBY, BREAKROOM, AND MAIL ROOM BEING SUPPLIED BY AHU-3
 & 4. PLEASE NOTE THE CALCULATIONS SHALL BE IN
 ACCORDANCE WITH TABLE 403.3.1.1 FBC M.
  
 3) M5-01: CONCERNING THE USE OF NATURAL VENTILATION FOR
 THE APARTMENTS, PLEASE REFER TO SECTION 401.2 FBC M.
 NATURAL VENTILATION CAN ONLY BE USED IF THE APARTMENTS
 ARE NOT REQUIRED TO HAVE MECHANICAL VENTILATION.
 401.2 VENTILATION REQUIRED.
 "EVERY OCCUPIED SPACE SHALL BE VENTILATED BY NATURAL
 MEANS IN ACCORDANCE WITH SECTION 402 OR BY MECHANICAL
 MEANS IN ACCORDANCE WITH SECTION 403. WHERE THE AIR
 INFILTRATION RATE IN A DWELLING UNIT IS LESS THAN 3 AIR
 CHANGES PER HOUR WHEN TESTED WITH A BLOWER DOOR AT A
 PRESSURE OF 0.2-INCH WATER COLUMN (50 PA) IN ACCORDANCE
 WITH SECTION R402.4.1.2 OF THE FLORIDA BUILDING CODE,
 ENERGY CONSERVATION, THE DWELLING UNIT SHALL BE
 VENTILATED BY MECHANICAL MEANS IN ACCORDANCE WITH
 SECTION 403."
 FOR MORE INFORMATION REFER TO SECTIONS R402.4.1.2, AND
 C402.5 THROUGH C402.5.8
  
 4) M-101A: AN EXHAUST INLET SHALL BE INSTALLED IN THE
 AREA OF HEAVIEST CONCENTRATIONS OF CONTAMINANTS
 ACCORDING TO SECTION 502.1.1 FBC M. DOES THE LOCATION
 OF GARAGE FAN F-2 MEET THAT CRITERIA? WILL CIRCULATION
 FANS BE INSTALLED IN THE GARAGE?
  
 5) M-101A: SHOW HOW THE F-2 FAN WILL BE PROTECTED FROM
 VEHICULAR DAMAGE- SECTION 303.4 AND 304.6 FBC M.
  
 6) M-101A: SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE CO AND NO2 SENSORS.
 PLEASE NOTE THAT THE SPECS MAY BE A DEFERRED SUBMITTAL.
  
 7) M-101.A: THE L-3 MAKEUP AIR LOUVER AT THE COMMON
 WALL BETWEEN THE PARKING GARAGE AND THE DIESEL FIRE
 PUMP ROOM IS NOT PERMITTED. MAKEUP AIR SHALL BE TAKEN
 FROM A CLEAN SOURCE OUTSIDE OF THE BUILDING, AND ALL
 AIR FROM THE ENCLOSED GARAGE SHALL BE EXHAUSTED AND NOT
 PERMITTED TO BE RECIRCULATED- TABLE 403.3.1.1, AND
 SECTIONS 506.5 AND 401.4 FBC M. A) PLEASE NOTE THAT THE
 WALLS AND CEILING ENCLOSING THE PUMP AND FUEL TANK ROOM
 SHALL BE MINIMUM 1-HR. FIRE-RATED IN ACCORDANCE WITH
 TABLE 4.13.1.1.2 NFPA 20, AND TABLE 307.1 AND SECTION
 414.2 FBC B. THE LIFE SAFETY PLAN- SHEET CD-01 SHOWS NO
 FIRE-RATING FOR THE COMMON WALL SEPARATING THE ENCLOSED
 GARAGE AND THE PUMP ROOM. PLEASE CORRECT.
  
 8) M-101A: PROVIDE EXHAUST VENTILATION CALCULATIONS AND
 THE SEQUENCE OF OPERATION FOR THE PUMP ROOM FAN F-5-
 SEE SECTION 502.8.1.1 SEE SYSTEM REQUIREMENTS BELOW-
  
 1. MECHANICAL VENTILATION SHALL BE PROVIDED AT A RATE
 OF NOT LESS THAN 1 CFM PER SQUARE FOOT OF FLOOR AREA
 OVER THE STORAGE AREA.
 2. THE SYSTEMS SHALL OPERATE CONTINUOUSLY UNLESS
 ALTERNATE DESIGNS ARE APPROVED.
 3. A MANUAL SHUTOFF CONTROL SHALL BE PROVIDED OUTSIDE
 OF THE ROOM IN A POSITION ADJACENT TO THE ACCESS DOOR
 TO THE ROOM OR IN ANOTHER APPROVEDLOCATION. THE SWITCH
 SHALL BE A BREAK-GLASS OR OTHER APPROVED TYPE AND SHALL
 BE LABELED: VENTILATION SYSTEM EMERGENCY SHUTOFF.
 4. THE EXHAUST VENTILATION SHALL BE DESIGNED TO
 CONSIDER THE DENSITY OF THE POTENTIAL FUMES OR VAPORS
 RELEASED. FOR FUMES OR VAPORS THAT ARE HEAVIER THAN
 AIR, EXHAUST SHALL BE TAKEN FROM A POINT WITHIN 12
 INCHES (305 MM) OF THE FLOOR. FOR FUMES OR VAPORS THAT
 ARE LIGHTER THAN AIR, EXHAUST SHALL BE TAKEN FROM A
 POINT WITHIN 12 INCHES (305 MM) OF THE HIGHEST POINT OF
 THE ROOM.
 5. THE LOCATION OF BOTH THE EXHAUST AND INLET AIR
 OPENINGS SHALL BE DESIGNED TO PROVIDE AIR MOVEMENT
 ACROSS ALL PORTIONS OF THE FLOOR OR ROOM TO PREVENT THE
 ACCUMULATION OF VAPORS.
 6. THE EXHAUST AIR SHALL NOT BE RECIRCULATED TO
 OCCUPIED AREAS IF THE MATERIALS STORED ARE CAPABLE OF
 EMITTING HAZARDOUS VAPORS AND CONTAMINANTS HAVE NOT
 BEEN REMOVED. AIR CONTAMINATED WITH EXPLOSIVE OR
 FLAMMABLE VAPORS, FUMES OR DUSTS; FLAMMABLE, HIGHLY
 TOXIC OR TOXIC GASES; OR RADIOACTIVE MATERIALS SHALL
 NOT BE RECIRCULATED.
  
 9) M-101A: PROVIDE THE REQUIRED CLEARANCES ON THE PLAN
 FOR THE F-5 EXHAUST OUTLET- SECTION 501.3.1 (2) FBC M.
  
 10) M-101A & FP1-01A: PROVIDE PRODUCT SUBMITTALS FOR
 THE DIESEL FIRE PUMP, THE PUMP EXHAUST DUCTWORK, AND
 THE 200-GALLON DIESEL FUEL TANK- SECTIONS 4.2 AND
 11.5.2.5 NFPA 20, AND SECTION 22.1 NFPA 30. THE
 SUBMITTALS SHALL INDICATE THE UL LISTINGS FOR EACH
 PRODUCT. PLEASE NOTE THAT THE SUBMITTALS MAY BE
 DEFERRED BY REQUEST.
  
 11) M-101A & FP1-01A: PLEASE NOTE THE VENTILATION
 SYSTEM FOR THE PUMP AS DESIGNED WILL BE CAPABLE OF
 MAINTAINING A MAXIMUM TEMPERATURE OF 120 DEGREES F IN
 THE ROOM, WILL PROVIDE ADEQUATE COMBUSTION AIR, AND
 WILL REMOVE ALL HAZARDOUS VAPORS- SECTION 11.3.2.1 NFPA
 20. PLEASE NOTE THERE IS NO AC SYSTEM IN THE ROOM
  
 12) FP1-01A: PROVIDE FILL AND VENT PIPE SPECIFICATIONS,
 PIPE SIZING CALCULATIONS, PIPE INSTALLATION DETAILS-
 JOINTS AND CONNECTIONS, AND PIPE SUPPORT DETAILS-
 SECTION 1302, 1303, 1305 FBC M. B) SHOW THE REMOTE FILL
 PIPING LOCATION AND FILL PIPING RUN- SECTION 1305.6 FBC
 M. C) SHOW THE NORMAL AND EMERGENCY RELIEF VENT PIPING
 RUNS AND TERMINATION LOCATIONS AT THE EXTERIOR OF THE
 BUILDING WITH REQUIRED CLEARANCES- SECTION 1305.7 FBC
 M.
  
 13) M-101A: IT APPEARS THE F-3 INLINE FAN FOR THE TRASH
 ROOM IS NOT LOCATED IN THE ROOM OR HAS NO EXHAUST GRILL
 CONNECTION SHOWN- SECTION 107.2.1 WPB.
  
 14) M-101A: PROVIDE AUTOMATICALLY CONTROLLED SHUTOFF
 DAMPERS- EITHER MOTORIZED OR GRAVITY FOR THE O/A INTAKE
 DUCTS TO AHU 3 & 4- SECTION C403.2.4.3 FBC EC.
  
 15) M-101A: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 SUPPLY AIR SYSTEMS OF THE 5-TON AHU 3 & 4 SYSTEMS PER
 SECTION 606.2.1. PLEASE NOTE THAT AN EXEMPTION CAN BE
 APPLIED IF THE MANUFACTURER'S SPECIFICATIONS INDICATE
 THE SYSTEMS ARE NOT CAPABLE OF PRODUCING OVER 2000 CFMS
 OF SUPPLY AIR.
  
 16) M-101A: PROVIDE CONDENSATE DISPOSAL PLANS FOR AHU-3
 & 4- SECTION 307.2.1 FBC M.
  
 17) M-101A & B: PLEASE VERIFY ALL FUTURE KITCHEN
 EXHAUST TERMINATIONS WILL MEET REQUIRED CLEARANCES PER
 SECTIONS 501.3.1, 506.3.13.2 & 506.3.13.3 FBC M,
 INCLUDING 10' CLEARANCES FROM GRADE AND THE PROPERTY
 LINE.
  
 18) M-101A & B: PLACE A NOTE INDICATING SEPARATE
 PERMITS ARE REQUIRED FOR THE KITCHEN HOOD EXHAUST
 SYSTEMS, THE FIRE SUPPRESSIONS SYSTEMS, AND WALK-IN
 COOLERS AND FREEZERS- SECTION 107.2.1 WPB. A)
 CONCERNING THE HOOD SYSTEMS UNDER SEPARATE PERMIT
 PLEASE BE ADVISED THAT SECTION 508.1.1 FBC M- MAKEUP
 AIR TEMPERATURE WILL BE ENFORCED: THE TEMPERATURE
 DIFFERENTIAL BETWEEN MAKEUP AIR AND THE AIR IN THE
 CONDITIONED SPACE SHALL NOT EXCEED 10 DEGREESF (6?C)
 EXCEPT WHERE THE ADDED HEATING AND COOLING LOADS OF THE
 MAKEUP AIRDO NOT EXCEED THE CAPACITY OF THE HVAC
 SYSTEM.
  
 19) M-101B: OUTDOOR VENTILATION AIR IS REQUIRED FOR THE
 ELEVATOR LOBBY- SECTION 404.3 AND TABLE 403.3.1.1 FBC
 M.
  
 20) M-101B: AN EXHAUST VENTILATION SYSTEM IS REQUIRED
 FOR THE PET SPA- TABLE 403.3.1.1 FBC M. PLEASE PROVIDE
 A SYSTEM AND FAN SIZING CALCULATIONS. IF THE SPA IS TO
 BE UNDER SEPARATE PERMIT, PLEASE PLACE A NOTE ON THE
 PLAN ACCORDINGLY. NOTE- THE PLAN SHOWS AN UNTAGGED AIR
 HANDLER IN THE SPACE. A) SHEET CD-01: THE LIFE SAFETY
 DOES NOT INDICATE THAT THE COMMON WALLS SEPARATING THE
 PET SPA/TRANSFORMER ROOM AND PET SPA/GARAGE ARE
 FIRE-RESISTANT RATED- TABLE 508.4 FBC B.
  
 21) M-102B: THE PLAN APPEARS TO SHOW HP CONDENSERS
 INSTALLED INSIDE THE BUILDING WHICH MAY NOT BE IN
 ACCORDANCE WITH THE PRODUCT'S LISTING AND INSTALLATION
 GUIDELINES- SECTION 304.1 FBC M. A) PLEASE PROVIDE
 DETAILS TO INDICATE HOW THE CONDENSERS ARE TO BE
 INSTALLED. WILL THEY BE ANCHORED DIRECTLY TO THE SLAB,
 ON WALL BRACKETS, STANDS? HOW WILL THEY BE PROTECTED
 FROM VEHICLE DAMAGE- SEE SECTIONS 303.4 AND 304.6 FBC
 M.
  
 22) M-103B: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE GAS-FIRED POOL HEATER (MAY BE A DEFERRED
 SUBMITTAL)- SECTION 617.1 FBC FG. THE SPECS AND
 INSTALLATION GUIDELINES SHALL VERIFY THE USE OF THE PVC
 COMBUSTION AIR INTAKE DUCT, AND B VENT SYSTEM. A)
 PROVIDE AN EQUIPMENT SCHEDULE ON THE PLAN FOR THE POOL
 HEATER INCLUDING THE TOTAL BTUH INPUT RATING OF THE
 APPLIANCE. B) PROVIDE A VENTING DIAGRAM SHOWING THE
 SIZE OF THE VENT, RISER HEIGHT, LATERAL LENGTH, AND
 TOTAL VENT RUN- TABLE 504.2(1) FBC FG.
  
 24) M-101B: PROVIDE A LIST OF POOL TREATMENT CHEMICALS
 AND MATERIALS THAT WILL BE STORED IN THE POOL EQUIPMENT
 ROOM, AND THE QUANTITIES OF THE CHEMICALS AND
 MATERIALS- SEE SECTION 414.1.3 FBC B. A) PLEASE NOTE
 THAT SHEET CD-03 DOES NOT INDICATE FIRE-RATED WALLS FOR
 THE ROOM.
  
 25) M-101B: PROVIDE EXHAUST VENTILATION CALCULATIONS
 FOR THE POOL EQUIPMENT ROOM AND A SEQUENCE OF OPERATION
 FOR THE F-8 FAN. A) REFER TO SECTION 510.9 FBC M AND
 PROVIDE THE TYPE OF EXHAUST DUCTWORK TO BE INSTALLED.
  
 26) M-104A & B: THE ACCESS PANELS SPECIFIED UNDER NOTE
 #2 SHALL BE SIZED LARGE ENOUGH TO REMOVE THE FAN COIL
 UNITS- SECTION 306.1 FBC M.
  
 27) M-105A: IT APPEARS FIRE DAMPERS ARE MISSING FOR THE
 AHU-5 & 6 SUPPLY, RETURN, AND O/A DUCTS PENETRATING THE
 FIRE-RATED MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC
 M.
  
 28) M-105A: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 SUPPLY AIR SYSTEMS OF THE 5-TON AHU 5, 6, & 7 SYSTEMS
 PER SECTION 606.2.1. PLEASE NOTE THAT AN EXEMPTION CAN
 BE APPLIED IF THE MANUFACTURER'S SPECIFICATIONS
 INDICATE THE SYSTEMS ARE NOT CAPABLE OF PRODUCING OVER
 2000 CFMS OF SUPPLY AIR.
  
 29) M-105A: PROVIDE AUTOMATICALLY CONTROLLED SHUTOFF
 DAMPERS- EITHER MOTORIZED OR GRAVITY FOR THE O/A INTAKE
 DUCTS TO AHU 5,6, & 7- SECTION C403.2.4.3 FBC EC.
  
 30) M-104A, 105A, 106A, 107A, 108A: IT DOES NOT APPEAR
 THAT THE O/A IS BEING EVENLY DISTRIBUTED TO ALL AREA OF
 THE CORRIDORS AS DEPICTED ON THE PLANS.
  
 31) M-301 THROUGH M-305: REQUIRED EXHAUST VENTILATION
 FOR THE KITCHENS NOT SHOWN- SECTION AND TABLE 403.3.2.3
 FBC M.
  
 32) M-301 THROUGH M-305: PLEASE PLACE NOTES ON THE PLAN
 TO INDICATE NO COMBUSTIBLE MATERIAL IN THE RETURN
 PLENUMS, NO FUEL-FIRED APPLIANCES IN THE RETURN
 PLENUMS, AND THE ACCESS PANELS FOR THE FAN COIL UNITS
 SHALL BE SIZED LARGE ENOUGH FOR SERVICE AND REPLACEMENT
 OF THE UNITS- SECTIONS 606.1, 606.2, AND 306.1 FBC M.
  
 33) M-302- 303: SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR ALL CLOTHES DRYERS SHOWN ON THE PLANS, AND INDICATE
 THE TYPE AND SIZE OF DUCTS, AND TOTAL LENGTH OF THE
 DUCT RUN ON THE PLANS- SECTION 504.1 AND 504.8.4 FBC M.
  
 34) M-302, UNIT A3: THE MAIN RETURN THROUGH THE
 LOUVERED DOOR SHALL BE MINIMUM 10' FROM THE COOKING
 APPLIANCE- SECTION 601.5 FBC M. A) PLEASE NOTE THE
 LOUVERED DOOR SHALL BE NON-COMBUSTIBLE IN ACCORDANCE
 WITH SECTION 602.1 FBC M.
  
 35) M-302, UNIT A4: SHOW THE SUPPLY CFMS AT AD-2
 DIFFUSER.
  
 36) M-302 & M-501, UNIT B1: FCU-3 HAS A MAXIMUM CFM
 CAPACITY OF 430 CFMS, HOWEVER THE LAYOUT PLAN INDICATES
 580 CFMS REQUIRED.
  
 37) M-303, UNIT B2C: SHOW THE SUPPLY CFMS AT AD-3
 DIFFUSER.
  
 38) M-401: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 SUPPLY AIR SYSTEMS OF DOAS-1 & 2 PER SECTION 606.2.1
 FBC M.
  
 39) COMMISSIONING PLAN: COMMISSIONING OF THE MECHANICAL
 SYSTEMS AND SERVICE WATER HEATING SYSTEMS IS REQUIRED
 PER SECTION C408.2 FBC EC. COMMISSIONING PLAN. "PRIOR
 TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, THE
 LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER, OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION".
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 40) DEFERRED SUBMITTALS: REQUIRED SUBMITTALS LISTED
 BELOW SHALL HAVE SHOP DRAWING STAMPS BY THE EOR AND
 EITHER BE SUBMITTED TO THE BUILDING DEPARTMENT, OR BE
 IN THE FIELD AT TIME OF INSPECTION.
 A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS.
 B) MOTORIZED AND GRAVITY DAMPERS
 C) DUCT SMOKE DETECTORS
 D) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES
 INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'SEF) AC STAND NOA'S OR
 FL. PRODUCT APPROVALS
 E) C0, N02, & CO2 SENSORS
 F) CLOTHES DRYERS
 G) TOILET AND DRYER EXHAUST WALL CAPS
 H) COOKING APPLIANCES
 I) SIGNED AND SEALED SITE-SPECIFIC WIND LOAD
 ENGINEERING FOR INSTALLATION OF ALL ROOF TOP MECHANICAL
 EQUIPMENT.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved