| 2020-03-13 15:22:54 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #20011267 |
| | 3/12/20 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH |
| | EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SUBMIT AC COOLING AND HEATING CALCULATIONS FOR ALL |
| | SYSTEMS- SECTION C403.2.1 FBC EC. |
| | |
| | 2) SHEET M-101A & M5-01: THE O/A VENTILATION SCHEDULE |
| | DOES NOT INCLUDE CALCULATIONS FOR THE GROUND FLOOR |
| | LOBBY, BREAKROOM, AND MAIL ROOM BEING SUPPLIED BY AHU-3 |
| | & 4. PLEASE NOTE THE CALCULATIONS SHALL BE IN |
| | ACCORDANCE WITH TABLE 403.3.1.1 FBC M. |
| | |
| | 3) M5-01: CONCERNING THE USE OF NATURAL VENTILATION FOR |
| | THE APARTMENTS, PLEASE REFER TO SECTION 401.2 FBC M. |
| | NATURAL VENTILATION CAN ONLY BE USED IF THE APARTMENTS |
| | ARE NOT REQUIRED TO HAVE MECHANICAL VENTILATION. |
| | 401.2 VENTILATION REQUIRED. |
| | "EVERY OCCUPIED SPACE SHALL BE VENTILATED BY NATURAL |
| | MEANS IN ACCORDANCE WITH SECTION 402 OR BY MECHANICAL |
| | MEANS IN ACCORDANCE WITH SECTION 403. WHERE THE AIR |
| | INFILTRATION RATE IN A DWELLING UNIT IS LESS THAN 3 AIR |
| | CHANGES PER HOUR WHEN TESTED WITH A BLOWER DOOR AT A |
| | PRESSURE OF 0.2-INCH WATER COLUMN (50 PA) IN ACCORDANCE |
| | WITH SECTION R402.4.1.2 OF THE FLORIDA BUILDING CODE, |
| | ENERGY CONSERVATION, THE DWELLING UNIT SHALL BE |
| | VENTILATED BY MECHANICAL MEANS IN ACCORDANCE WITH |
| | SECTION 403." |
| | FOR MORE INFORMATION REFER TO SECTIONS R402.4.1.2, AND |
| | C402.5 THROUGH C402.5.8 |
| | |
| | 4) M-101A: AN EXHAUST INLET SHALL BE INSTALLED IN THE |
| | AREA OF HEAVIEST CONCENTRATIONS OF CONTAMINANTS |
| | ACCORDING TO SECTION 502.1.1 FBC M. DOES THE LOCATION |
| | OF GARAGE FAN F-2 MEET THAT CRITERIA? WILL CIRCULATION |
| | FANS BE INSTALLED IN THE GARAGE? |
| | |
| | 5) M-101A: SHOW HOW THE F-2 FAN WILL BE PROTECTED FROM |
| | VEHICULAR DAMAGE- SECTION 303.4 AND 304.6 FBC M. |
| | |
| | 6) M-101A: SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE CO AND NO2 SENSORS. |
| | PLEASE NOTE THAT THE SPECS MAY BE A DEFERRED SUBMITTAL. |
| | |
| | 7) M-101.A: THE L-3 MAKEUP AIR LOUVER AT THE COMMON |
| | WALL BETWEEN THE PARKING GARAGE AND THE DIESEL FIRE |
| | PUMP ROOM IS NOT PERMITTED. MAKEUP AIR SHALL BE TAKEN |
| | FROM A CLEAN SOURCE OUTSIDE OF THE BUILDING, AND ALL |
| | AIR FROM THE ENCLOSED GARAGE SHALL BE EXHAUSTED AND NOT |
| | PERMITTED TO BE RECIRCULATED- TABLE 403.3.1.1, AND |
| | SECTIONS 506.5 AND 401.4 FBC M. A) PLEASE NOTE THAT THE |
| | WALLS AND CEILING ENCLOSING THE PUMP AND FUEL TANK ROOM |
| | SHALL BE MINIMUM 1-HR. FIRE-RATED IN ACCORDANCE WITH |
| | TABLE 4.13.1.1.2 NFPA 20, AND TABLE 307.1 AND SECTION |
| | 414.2 FBC B. THE LIFE SAFETY PLAN- SHEET CD-01 SHOWS NO |
| | FIRE-RATING FOR THE COMMON WALL SEPARATING THE ENCLOSED |
| | GARAGE AND THE PUMP ROOM. PLEASE CORRECT. |
| | |
| | 8) M-101A: PROVIDE EXHAUST VENTILATION CALCULATIONS AND |
| | THE SEQUENCE OF OPERATION FOR THE PUMP ROOM FAN F-5- |
| | SEE SECTION 502.8.1.1 SEE SYSTEM REQUIREMENTS BELOW- |
| | |
| | 1. MECHANICAL VENTILATION SHALL BE PROVIDED AT A RATE |
| | OF NOT LESS THAN 1 CFM PER SQUARE FOOT OF FLOOR AREA |
| | OVER THE STORAGE AREA. |
| | 2. THE SYSTEMS SHALL OPERATE CONTINUOUSLY UNLESS |
| | ALTERNATE DESIGNS ARE APPROVED. |
| | 3. A MANUAL SHUTOFF CONTROL SHALL BE PROVIDED OUTSIDE |
| | OF THE ROOM IN A POSITION ADJACENT TO THE ACCESS DOOR |
| | TO THE ROOM OR IN ANOTHER APPROVEDLOCATION. THE SWITCH |
| | SHALL BE A BREAK-GLASS OR OTHER APPROVED TYPE AND SHALL |
| | BE LABELED: VENTILATION SYSTEM EMERGENCY SHUTOFF. |
| | 4. THE EXHAUST VENTILATION SHALL BE DESIGNED TO |
| | CONSIDER THE DENSITY OF THE POTENTIAL FUMES OR VAPORS |
| | RELEASED. FOR FUMES OR VAPORS THAT ARE HEAVIER THAN |
| | AIR, EXHAUST SHALL BE TAKEN FROM A POINT WITHIN 12 |
| | INCHES (305 MM) OF THE FLOOR. FOR FUMES OR VAPORS THAT |
| | ARE LIGHTER THAN AIR, EXHAUST SHALL BE TAKEN FROM A |
| | POINT WITHIN 12 INCHES (305 MM) OF THE HIGHEST POINT OF |
| | THE ROOM. |
| | 5. THE LOCATION OF BOTH THE EXHAUST AND INLET AIR |
| | OPENINGS SHALL BE DESIGNED TO PROVIDE AIR MOVEMENT |
| | ACROSS ALL PORTIONS OF THE FLOOR OR ROOM TO PREVENT THE |
| | ACCUMULATION OF VAPORS. |
| | 6. THE EXHAUST AIR SHALL NOT BE RECIRCULATED TO |
| | OCCUPIED AREAS IF THE MATERIALS STORED ARE CAPABLE OF |
| | EMITTING HAZARDOUS VAPORS AND CONTAMINANTS HAVE NOT |
| | BEEN REMOVED. AIR CONTAMINATED WITH EXPLOSIVE OR |
| | FLAMMABLE VAPORS, FUMES OR DUSTS; FLAMMABLE, HIGHLY |
| | TOXIC OR TOXIC GASES; OR RADIOACTIVE MATERIALS SHALL |
| | NOT BE RECIRCULATED. |
| | |
| | 9) M-101A: PROVIDE THE REQUIRED CLEARANCES ON THE PLAN |
| | FOR THE F-5 EXHAUST OUTLET- SECTION 501.3.1 (2) FBC M. |
| | |
| | 10) M-101A & FP1-01A: PROVIDE PRODUCT SUBMITTALS FOR |
| | THE DIESEL FIRE PUMP, THE PUMP EXHAUST DUCTWORK, AND |
| | THE 200-GALLON DIESEL FUEL TANK- SECTIONS 4.2 AND |
| | 11.5.2.5 NFPA 20, AND SECTION 22.1 NFPA 30. THE |
| | SUBMITTALS SHALL INDICATE THE UL LISTINGS FOR EACH |
| | PRODUCT. PLEASE NOTE THAT THE SUBMITTALS MAY BE |
| | DEFERRED BY REQUEST. |
| | |
| | 11) M-101A & FP1-01A: PLEASE NOTE THE VENTILATION |
| | SYSTEM FOR THE PUMP AS DESIGNED WILL BE CAPABLE OF |
| | MAINTAINING A MAXIMUM TEMPERATURE OF 120 DEGREES F IN |
| | THE ROOM, WILL PROVIDE ADEQUATE COMBUSTION AIR, AND |
| | WILL REMOVE ALL HAZARDOUS VAPORS- SECTION 11.3.2.1 NFPA |
| | 20. PLEASE NOTE THERE IS NO AC SYSTEM IN THE ROOM |
| | |
| | 12) FP1-01A: PROVIDE FILL AND VENT PIPE SPECIFICATIONS, |
| | PIPE SIZING CALCULATIONS, PIPE INSTALLATION DETAILS- |
| | JOINTS AND CONNECTIONS, AND PIPE SUPPORT DETAILS- |
| | SECTION 1302, 1303, 1305 FBC M. B) SHOW THE REMOTE FILL |
| | PIPING LOCATION AND FILL PIPING RUN- SECTION 1305.6 FBC |
| | M. C) SHOW THE NORMAL AND EMERGENCY RELIEF VENT PIPING |
| | RUNS AND TERMINATION LOCATIONS AT THE EXTERIOR OF THE |
| | BUILDING WITH REQUIRED CLEARANCES- SECTION 1305.7 FBC |
| | M. |
| | |
| | 13) M-101A: IT APPEARS THE F-3 INLINE FAN FOR THE TRASH |
| | ROOM IS NOT LOCATED IN THE ROOM OR HAS NO EXHAUST GRILL |
| | CONNECTION SHOWN- SECTION 107.2.1 WPB. |
| | |
| | 14) M-101A: PROVIDE AUTOMATICALLY CONTROLLED SHUTOFF |
| | DAMPERS- EITHER MOTORIZED OR GRAVITY FOR THE O/A INTAKE |
| | DUCTS TO AHU 3 & 4- SECTION C403.2.4.3 FBC EC. |
| | |
| | 15) M-101A: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | SUPPLY AIR SYSTEMS OF THE 5-TON AHU 3 & 4 SYSTEMS PER |
| | SECTION 606.2.1. PLEASE NOTE THAT AN EXEMPTION CAN BE |
| | APPLIED IF THE MANUFACTURER'S SPECIFICATIONS INDICATE |
| | THE SYSTEMS ARE NOT CAPABLE OF PRODUCING OVER 2000 CFMS |
| | OF SUPPLY AIR. |
| | |
| | 16) M-101A: PROVIDE CONDENSATE DISPOSAL PLANS FOR AHU-3 |
| | & 4- SECTION 307.2.1 FBC M. |
| | |
| | 17) M-101A & B: PLEASE VERIFY ALL FUTURE KITCHEN |
| | EXHAUST TERMINATIONS WILL MEET REQUIRED CLEARANCES PER |
| | SECTIONS 501.3.1, 506.3.13.2 & 506.3.13.3 FBC M, |
| | INCLUDING 10' CLEARANCES FROM GRADE AND THE PROPERTY |
| | LINE. |
| | |
| | 18) M-101A & B: PLACE A NOTE INDICATING SEPARATE |
| | PERMITS ARE REQUIRED FOR THE KITCHEN HOOD EXHAUST |
| | SYSTEMS, THE FIRE SUPPRESSIONS SYSTEMS, AND WALK-IN |
| | COOLERS AND FREEZERS- SECTION 107.2.1 WPB. A) |
| | CONCERNING THE HOOD SYSTEMS UNDER SEPARATE PERMIT |
| | PLEASE BE ADVISED THAT SECTION 508.1.1 FBC M- MAKEUP |
| | AIR TEMPERATURE WILL BE ENFORCED: THE TEMPERATURE |
| | DIFFERENTIAL BETWEEN MAKEUP AIR AND THE AIR IN THE |
| | CONDITIONED SPACE SHALL NOT EXCEED 10 DEGREESF (6?C) |
| | EXCEPT WHERE THE ADDED HEATING AND COOLING LOADS OF THE |
| | MAKEUP AIRDO NOT EXCEED THE CAPACITY OF THE HVAC |
| | SYSTEM. |
| | |
| | 19) M-101B: OUTDOOR VENTILATION AIR IS REQUIRED FOR THE |
| | ELEVATOR LOBBY- SECTION 404.3 AND TABLE 403.3.1.1 FBC |
| | M. |
| | |
| | 20) M-101B: AN EXHAUST VENTILATION SYSTEM IS REQUIRED |
| | FOR THE PET SPA- TABLE 403.3.1.1 FBC M. PLEASE PROVIDE |
| | A SYSTEM AND FAN SIZING CALCULATIONS. IF THE SPA IS TO |
| | BE UNDER SEPARATE PERMIT, PLEASE PLACE A NOTE ON THE |
| | PLAN ACCORDINGLY. NOTE- THE PLAN SHOWS AN UNTAGGED AIR |
| | HANDLER IN THE SPACE. A) SHEET CD-01: THE LIFE SAFETY |
| | DOES NOT INDICATE THAT THE COMMON WALLS SEPARATING THE |
| | PET SPA/TRANSFORMER ROOM AND PET SPA/GARAGE ARE |
| | FIRE-RESISTANT RATED- TABLE 508.4 FBC B. |
| | |
| | 21) M-102B: THE PLAN APPEARS TO SHOW HP CONDENSERS |
| | INSTALLED INSIDE THE BUILDING WHICH MAY NOT BE IN |
| | ACCORDANCE WITH THE PRODUCT'S LISTING AND INSTALLATION |
| | GUIDELINES- SECTION 304.1 FBC M. A) PLEASE PROVIDE |
| | DETAILS TO INDICATE HOW THE CONDENSERS ARE TO BE |
| | INSTALLED. WILL THEY BE ANCHORED DIRECTLY TO THE SLAB, |
| | ON WALL BRACKETS, STANDS? HOW WILL THEY BE PROTECTED |
| | FROM VEHICLE DAMAGE- SEE SECTIONS 303.4 AND 304.6 FBC |
| | M. |
| | |
| | 22) M-103B: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR |
| | THE GAS-FIRED POOL HEATER (MAY BE A DEFERRED |
| | SUBMITTAL)- SECTION 617.1 FBC FG. THE SPECS AND |
| | INSTALLATION GUIDELINES SHALL VERIFY THE USE OF THE PVC |
| | COMBUSTION AIR INTAKE DUCT, AND B VENT SYSTEM. A) |
| | PROVIDE AN EQUIPMENT SCHEDULE ON THE PLAN FOR THE POOL |
| | HEATER INCLUDING THE TOTAL BTUH INPUT RATING OF THE |
| | APPLIANCE. B) PROVIDE A VENTING DIAGRAM SHOWING THE |
| | SIZE OF THE VENT, RISER HEIGHT, LATERAL LENGTH, AND |
| | TOTAL VENT RUN- TABLE 504.2(1) FBC FG. |
| | |
| | 24) M-101B: PROVIDE A LIST OF POOL TREATMENT CHEMICALS |
| | AND MATERIALS THAT WILL BE STORED IN THE POOL EQUIPMENT |
| | ROOM, AND THE QUANTITIES OF THE CHEMICALS AND |
| | MATERIALS- SEE SECTION 414.1.3 FBC B. A) PLEASE NOTE |
| | THAT SHEET CD-03 DOES NOT INDICATE FIRE-RATED WALLS FOR |
| | THE ROOM. |
| | |
| | 25) M-101B: PROVIDE EXHAUST VENTILATION CALCULATIONS |
| | FOR THE POOL EQUIPMENT ROOM AND A SEQUENCE OF OPERATION |
| | FOR THE F-8 FAN. A) REFER TO SECTION 510.9 FBC M AND |
| | PROVIDE THE TYPE OF EXHAUST DUCTWORK TO BE INSTALLED. |
| | |
| | 26) M-104A & B: THE ACCESS PANELS SPECIFIED UNDER NOTE |
| | #2 SHALL BE SIZED LARGE ENOUGH TO REMOVE THE FAN COIL |
| | UNITS- SECTION 306.1 FBC M. |
| | |
| | 27) M-105A: IT APPEARS FIRE DAMPERS ARE MISSING FOR THE |
| | AHU-5 & 6 SUPPLY, RETURN, AND O/A DUCTS PENETRATING THE |
| | FIRE-RATED MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC |
| | M. |
| | |
| | 28) M-105A: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | SUPPLY AIR SYSTEMS OF THE 5-TON AHU 5, 6, & 7 SYSTEMS |
| | PER SECTION 606.2.1. PLEASE NOTE THAT AN EXEMPTION CAN |
| | BE APPLIED IF THE MANUFACTURER'S SPECIFICATIONS |
| | INDICATE THE SYSTEMS ARE NOT CAPABLE OF PRODUCING OVER |
| | 2000 CFMS OF SUPPLY AIR. |
| | |
| | 29) M-105A: PROVIDE AUTOMATICALLY CONTROLLED SHUTOFF |
| | DAMPERS- EITHER MOTORIZED OR GRAVITY FOR THE O/A INTAKE |
| | DUCTS TO AHU 5,6, & 7- SECTION C403.2.4.3 FBC EC. |
| | |
| | 30) M-104A, 105A, 106A, 107A, 108A: IT DOES NOT APPEAR |
| | THAT THE O/A IS BEING EVENLY DISTRIBUTED TO ALL AREA OF |
| | THE CORRIDORS AS DEPICTED ON THE PLANS. |
| | |
| | 31) M-301 THROUGH M-305: REQUIRED EXHAUST VENTILATION |
| | FOR THE KITCHENS NOT SHOWN- SECTION AND TABLE 403.3.2.3 |
| | FBC M. |
| | |
| | 32) M-301 THROUGH M-305: PLEASE PLACE NOTES ON THE PLAN |
| | TO INDICATE NO COMBUSTIBLE MATERIAL IN THE RETURN |
| | PLENUMS, NO FUEL-FIRED APPLIANCES IN THE RETURN |
| | PLENUMS, AND THE ACCESS PANELS FOR THE FAN COIL UNITS |
| | SHALL BE SIZED LARGE ENOUGH FOR SERVICE AND REPLACEMENT |
| | OF THE UNITS- SECTIONS 606.1, 606.2, AND 306.1 FBC M. |
| | |
| | 33) M-302- 303: SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | FOR ALL CLOTHES DRYERS SHOWN ON THE PLANS, AND INDICATE |
| | THE TYPE AND SIZE OF DUCTS, AND TOTAL LENGTH OF THE |
| | DUCT RUN ON THE PLANS- SECTION 504.1 AND 504.8.4 FBC M. |
| | |
| | 34) M-302, UNIT A3: THE MAIN RETURN THROUGH THE |
| | LOUVERED DOOR SHALL BE MINIMUM 10' FROM THE COOKING |
| | APPLIANCE- SECTION 601.5 FBC M. A) PLEASE NOTE THE |
| | LOUVERED DOOR SHALL BE NON-COMBUSTIBLE IN ACCORDANCE |
| | WITH SECTION 602.1 FBC M. |
| | |
| | 35) M-302, UNIT A4: SHOW THE SUPPLY CFMS AT AD-2 |
| | DIFFUSER. |
| | |
| | 36) M-302 & M-501, UNIT B1: FCU-3 HAS A MAXIMUM CFM |
| | CAPACITY OF 430 CFMS, HOWEVER THE LAYOUT PLAN INDICATES |
| | 580 CFMS REQUIRED. |
| | |
| | 37) M-303, UNIT B2C: SHOW THE SUPPLY CFMS AT AD-3 |
| | DIFFUSER. |
| | |
| | 38) M-401: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | SUPPLY AIR SYSTEMS OF DOAS-1 & 2 PER SECTION 606.2.1 |
| | FBC M. |
| | |
| | 39) COMMISSIONING PLAN: COMMISSIONING OF THE MECHANICAL |
| | SYSTEMS AND SERVICE WATER HEATING SYSTEMS IS REQUIRED |
| | PER SECTION C408.2 FBC EC. COMMISSIONING PLAN. "PRIOR |
| | TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, THE |
| | LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, |
| | MECHANICAL ENGINEER, OR APPROVED AGENCY SHALL PROVIDE |
| | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND |
| | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS |
| | SECTION". |
| | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED |
| | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL |
| | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE |
| | FOLLOWING ITEMS: |
| | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| | THE ACTIVITIES. |
| | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| | BE PERFORMED. |
| | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED |
| | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. |
| | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN |
| | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| | 5. MEASURABLE CRITERIA FOR PERFORMANCE' |
| | |
| | 40) DEFERRED SUBMITTALS: REQUIRED SUBMITTALS LISTED |
| | BELOW SHALL HAVE SHOP DRAWING STAMPS BY THE EOR AND |
| | EITHER BE SUBMITTED TO THE BUILDING DEPARTMENT, OR BE |
| | IN THE FIELD AT TIME OF INSPECTION. |
| | A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS. |
| | B) MOTORIZED AND GRAVITY DAMPERS |
| | C) DUCT SMOKE DETECTORS |
| | D) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES |
| | INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT |
| | APPROVALS AND/OR MIAMI-DADE NOA'SEF) AC STAND NOA'S OR |
| | FL. PRODUCT APPROVALS |
| | E) C0, N02, & CO2 SENSORS |
| | F) CLOTHES DRYERS |
| | G) TOILET AND DRYER EXHAUST WALL CAPS |
| | H) COOKING APPLIANCES |
| | I) SIGNED AND SEALED SITE-SPECIFIC WIND LOAD |
| | ENGINEERING FOR INSTALLATION OF ALL ROOF TOP MECHANICAL |
| | EQUIPMENT. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD |
| | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER |
| | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN |
| | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS |
| | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS |
| | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR |
| | UPDATED. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | |