| 2020-04-23 13:21:23 | |
| | NOTE: PLAN SHEETS A1.2.1 AND A1.3.1 WHICH WERE |
| | REFERENCED IN THE RESPONSE LETTER DATED 4/2/2020, DO |
| | NOT PERTAIN TO PERMIT 20010978 WHICH IS FOR WORK TO BE |
| | DONE ON THE SECOND FLOOR. |
| | 1) PER WPB FBC 107.2.1, PROVIDE LOCATION OF THE |
| | REQUIRED BI-LEVEL DRINKING FOUNTAIN CALLED OUT IN |
| | PLUMBING FIXTURE SCHEDULE NOTED ON PLAN SHEET P0.1. |
| | ARCHITECT TO PROVIDE ADEQUATE SPACE FOR SAID DRINKING |
| | FOUNTAIN, WHICH SHALL BE CLEARLY SHOWN AS THE REQUIRED |
| | BI-LEVEL DRINKING FOUNTAIN ON ARCHITECTURAL PLAN SHEETS |
| | PERTAINING TO THE SECOND FLOOR RENOVATION FOR WHICH IS |
| | APPLICABLE TO PERMIT 20010978, THAT WILL COMPLY WITH |
| | THE REQUIREMENTS OF FBC ACC CHAPTERS 3 AND 6. |
| | ADDITIONALLY, THE DRINKING FOUNTAIN, WHICH SHALL BE |
| | CLEARLY SHOWN AS THE REQUIRED BI-LEVEL DRINKING |
| | FOUNTAIN ON PLAN SHEET P2.1. 2ND REQUEST. |
| | 2) PER WPB FBC 107.2.1, ARCHITECT TO PROVIDE ON |
| | ARCHITECTURAL PLAN SHEETS PERTAINING TO THE SECOND |
| | FLOOR RENOVATION FOR WHICH IS APPLICABLE TO PERMIT |
| | 20010978, CLEAR FLOOR SPACES, REACH RANGES, AND TURNING |
| | SPACES AS REQUIRED FOR SINK, ICE MAKERS, FRIDGE/ |
| | FREEZER, DRINKING FOUNTAIN. FBC-ACC 306, 306, 804. |
| | 3) PER WPB FBC 107.2.1, ARCHITECT TO PROVIDE A DETAIL |
| | FOR THE DRINKING FOUNTAIN ON ARCHITECTURAL PLAN SHEETS |
| | PERTAINING TO THE SECOND FLOOR RENOVATION FOR WHICH IS |
| | APPLICABLE TO PERMIT 20010978, SHOWING COMPLIANCE WITH |
| | FBC ACC 307 AND 602. |
| | 4) RE: P0.1; THE FIXTURE PLUMBING SCHEDULE APPEARS TO |
| | APPLY TO OTHER RENOVATIONS IN ADDITION TO THE SECOND |
| | FLOOR RENOVATION. PER FBC 107.2.1, INDICATE ON THE |
| | PLUMBING FIXTURE SCHEDULE THAT S-1 AND NOT S-2 IS |
| | APPLICABLE TO THE SECOND FLOOR RENOVATION. |
| | 6) RE: P0.1; TYPICAL PLUMBING FIXTURE CONNECTION |
| | SCHEDULE. PLEASE COMPLY WITH THE FOLLOWING: |
| | A. COFFEE MAKER; PROVIDE BACKFLOW PREVENTOR FOR WATER |
| | CONNECTION |
| | B. FILTER; PROVIDE MANUFACTURER'S SPECIFICATION AND |
| | INSTALLATION MANUAL. |
| | 1. IF RO SYSTEM IS PROVIDED THEN A BACKFLOW PREVENTOR |
| | SHALL BE REQUIRED FOR THE WATER CONNECTION AND A |
| | TRAPPED AND VENTED ACCESSIBLE OPEN RECEPTACLE SHALL BE |
| | REQUIRED FOR THE DRAIN WHICH SHALL DISCHARGE TO THE |
| | OPEN RECEPTACLE THROUGH AN AIR GAP. THIS INFORMATION |
| | SHALL BE SHOWN IN PIPING ARRANGEMENT. |
| | 2. IF A REMOVABLE/REPLACEMENT TYPE FILTER IS PROVIDED, |
| | A BACKFLOW PREVENTER SHALL BE REQUIRED FOR THE WATER |
| | CONNECTION. |
| | C. REFRIGERATOR; PROVIDE BACKFLOW PREVENTOR FOR WATER |
| | CONNECTION |
| | 7) PER WPB FBC 107.2.1, PROVIDE WATER AND SANITARY |
| | RISER DIAGRAMS FOR THE PLUMBING WORK SHOWN IN PLAN |
| | VIEW. PLEASE NOTE THAT AN AAV SHALL NOT BE PERMITTED AS |
| | A FIXTURE VENT PER FBC PL 918.3.1 UNLESS THE HORIZONTAL |
| | BRANCH IS PROVIDED WITH A RELIEF VENT THAT CONNECTS TO |
| | THE VENT STACK. |
| | 8) IF DRINKING FOUNTAIN IS TO BE RELOCATED IN ORDER TO |
| | COMPLY WITH THE REQUIREMENTS OF FBC ACC 307 AND 602, |
| | THEN PER WPB FBC 107.2.1, PROVIDE PLAN VIEW AND RISER |
| | DIAGRAMS FOR THE REQUIRED PIPING. |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |