| Notes |
| Date |
Text |
| 2020-02-04 11:37:38 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING- DRY-IN PLAN | | | AFTER DISCUSSION WITH KEN CONRAD THE FOLLOWING ITEMS | | | NEED TO BE ADDRESSED. | | | | | | 1) THE DRY-IN PLAN SHOULD HAVE THE CONTRACTOR'S | | | LETTERHEAD AND BE SIGNED BY THE QUALIFIER FOR THE | | | COMPANY. | | | | | | 2) THE DESIGNER OF RECORD NEEDS TO APPROVE THE USE OF | | | THE MASTERSEAL PRODUCT IN WRITING. | | | | | | 3) NOTHING WAS MENTIONED IN THE DRY-IN PLAN ABOUT THE | | | ROOF COVERING. THE ROOF COVERING SYSTEM NEEDS TO BE | | | COMPLETED. | | | | | | 4) ROOF PENETRATIONS SEALED AND THE METHOD USED. | | | | | | 5) HVAC SHAFT ROOF PENETRATIONS SEALED AND THE METHOD | | | USED. |
|