| 2020-02-26 07:42:48 | PLAN |
| | REVIEW COMMENTS |
| | 2ND REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THIS MEMBRANE STRUCTURE WILL BE ATTACHED TO AND A |
| | PART OF A BUILDING THAT IS OF TYPE IIB CONSTRUCTION AND |
| | IS FULLY SPRINKLERED. ACCORDING TO FBC 3102.3, |
| | NON-COMBUSTIBLE FRAME STRUCTURES COVERED BY AN APPROVED |
| | MEMBRANE IN ACCORDANCE WITH SECTION 3102.3.1 SHALL BE |
| | CLASSIFIED AS TYPE IIB CONSTRUCTION. THERE IS AN EXIT |
| | PATH OF TRAVEL PASSES THROUGH THIS MEMBRANE STRUCTURE |
| | WHICH CONTAINS TABLES AND CHAIRS AND IS A PART OF THE |
| | RESTAURANT. FBC SECTION 903.2.1.2 REQUIRES THIS PORTION |
| | OF THE BUILDING TO BE FIRE SPRINKLERED. SUBMIT PLANS |
| | THAT SHOW COMPLIANCE. |
| | |
| | 2) THE PLANS INDICATE THAT THE STEEL TRUSSES WILL BE |
| | ATTACHED TO WOOD BACKING OR OTHER. IF WOOD BACKING IS |
| | USED IT IS REQUIRED TO BE FIRE-RETARDANT-TREATED PER |
| | FBC 603.1. |
| | |
| | 3) THE PLANS STATE THAT THE FABRIC COVERS ARE REQUIRED |
| | TO BE REMOVED WHEN WINDSPEEDS ARE EXPECTED TO EXCEED 75 |
| | MPH. SPECIFY WHO WILL BE RESPONSIBLE FOR REMOVING THE |
| | FABRIC COVERS. SUBMIT TWO SETS OF DETAILED AWNING |
| | REMOVAL INSTRUCTIONS WITH PHOTOGRAPHS/DRAWINGS THAT |
| | SHOW HOW THIS IS DONE IN TERMS THAT A LAYMAN WILL |
| | UNDERSTAND. THESE INSTRUCTIONS ARE TO BE PROVIDED TO |
| | THE PROPERTY OWNER, OWNER'S REPRESENTATIVE OR LESSEE. |
| | FBC 107.2.1 |
| | |
| | 4) THE PLANS SHOW FABRIC ROLL UP SIDE PANELS. WILL |
| | THESE PANELS BE ROLLED UP AND REMAIN IN PLAN ON THE |
| | STRUCTURAL FRAME DURING PERIODS OF HIGH WINDS? IF SO |
| | WAS THIS CONSIDERED BY THE ENGINEER WHEN THE WINDLOAD |
| | ANALYSIS WAS PREFORMED? FBC 107.2.1 |
| | |
| | 5) SEPARATE PERMITS WILL BE REQUIRED FOR THE FIRE |
| | SPRINKLERS AND THE ELECTRICAL WORK. FBC 105 |
| | |
| | 6) THE PLANS FOR THE RESTAURANT BUILD OUT, PERMIT # |
| | 19110659, STATE THAT THE EXTERIOR CANOPY WILL BE |
| | DESIGNED BY A DELEGATE ENGINEER. THE PLANS ARE REQUIRED |
| | TO BE REVIEWED AND APPROVED BY THE DESIGNER OF RECORD. |
| | A SHOP DRAWING REVIEW STAMP IS REQUIRED ON THE PLANS. |
| | FAC 61G15-31.001 |
| | |
| | 7) SINCE THE MEMBRANE STRUCTURE IS STRUCTURALLY |
| | ATTACHED TO THE EXISTING BUILDING. THE EXISTING |
| | STRUCTURE NEEDS TO BE EVALUATED TO DETERMINE IF THE |
| | ADDITIONAL LOADS ( WINDLOADS, ETC.) FROM THE MEMBRANE |
| | STRUCTURE WILL HAVE A NEGATIVE AFFECT ON IT. FBC 1604 |
| | |
| | 8) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | |
| | |
| | |