| Plan Review Notes For Permit 19120807 |
| Permit Number |
19120807 |
|
| Review Stop |
Z |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-04-30 16:50:49 | FAILED | | | | | | 1) THE CIVIL PLAN NEEDS TO SHOW THE FULL EXTENT OF THE | | | GENERATOR PAD, INCLUDING DIMENSIONS, IN ITS CORRECT | | | LOCATION. | | | | | | 2) THE PROPOSED DUCK BANK, WHERE IT MEETS THE NORTH | | | SIDE OF THE COOLING TOWER ENCLOSURE, APPEARS TO | | | DIRECTLY CONFLICT WITH AN EXISTING SABAL PALM TREE. | | | PLEASE REVIEW THE PLACEMENT OF THE DUCT BANK TO AVOID | | | THE TREE AND PROVIDE DRAWINGS TO VERIFY THAT IT DOES | | | NOT INTERFERE WITH THE EXISTING TREE. | | | | | | 3) ZONING WILL NOT APPROVE THIS PERMIT UNTIL A TREE | | | ALTERATION PERMIT HAS BEEN SUBMITTED TO THE PLANNING | | | DIVISION AND APPROVED BY THE CITY'S LANDSCAPE PLANNER. | | | THIS IS REQUIRED SINCE THE PLANS CALL FOR TREES TO BE | | | REMOVED AT THE GENERATOR LOCATION. | | | | | | 4) THE FENCE RELOCATION IS APPROVED AS PART OF THIS | | | PERMIT AND DOES NOT REQUIRE A SEPARATE FENCE PERMIT. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] |
|