| Plan Review Notes For Permit 19120806 |
| Permit Number |
19120806 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-03-11 08:15:24 | 1) SHT. P1.3 - COMBUSTION AIR CALCULATIONS - THE MAKEUP | | | AIR FOR THE HOOD SYSTEM CANNOT BE USED FOR COMBUSTION | | | AIR FOR THE GAS FRYER PER THE 0217 FBC-FUEL GAS SEC. | | | 304.4 THE AIR FOR THE HOOD IS DEDICATED FOR THE HOOD. | | | COMPLY WITH 2017 FBC-FUEL GAS SEC.304.1 AND PROVIDE | | | COMBUSTION AIR FOR THE FRYER IN ACCORDANCE WITH THIS | | | SECTION. | | | 2) REGULATORS SHALL BE INSTALLED ON THE TANKLESS WATER | | | HEATERS IF THE GAS PRESSURE TO THE HEATERS EXCEEDS 10.5 | | | INCHES WATER COLUMN. SEE WATER HEATER SPECIFICATIONS. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|