| Plan Review Notes For Permit 19120743 |
| Permit Number |
19120743 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-01-23 13:43:55 | PLUMBING COMMENTS: APPROVED WITH PROVISO | | | PUMP DISCHARGE SHALL NOT CONNECT TO THE FLOOR SINK | | | FIXTURE DRAIN IN THE KITCHEN. PER FBC PL 712.3.5, PUMPS | | | CONNECTED TO THE DRAINAGE SYSTEM SHALL CONNECT TO A | | | BUILDING SEWER, BUILDING DRAIN, SOIL STACK, WASTE STACK | | | OR HORIZONTAL BRANCH DRAIN. WHERE THE DISCHARGE LINE | | | CONNECTS INTO HORIZONTAL DRAINAGE PIPING, THE | | | CONNECTION SHALL BE MADE THROUGH A WYE FITTING INTO THE | | | TOP OF THE DRAINAGE PIPING AND SUCH WYE FITTING SHALL | | | BE LOCATED NOT LESS THAN 10 PIPE DIAMETERS FROM THE | | | BASE OF ANY SOIL STACK, WASTE STACK OR FIXTURE DRAIN. | | | |
|