| Date |
Text |
| 2020-02-06 13:33:09 | PLUMBING COMMENTS: APPROVED W/PROVISO |
| | |
| | 1. PER WPB FBC 107.2.1 AND WPB FBC 107.3.4.1, PROVIDE |
| | AS A DEFERRED SUBMITTAL, THE FOLLOWING: |
| | |
| | A. A MANUFACTURER?S SPECIFICATION/CUT SHEET FOR THE |
| | WATER HEATER; TO INCLUDE MODEL, STORAGE CAPACITY AND |
| | ELECTRICAL CHARACTERISTICS. |
| | B. A MANUFACTURER?S SPECIFICATION/CUT SHEET FOR |
| | EXPANSION CONTROL DEVICE; TO INCLUDE MODEL AND SIZE. |
| | |
| | THE DOCUMENTS SHALL BE SUBMITTED AS A SUPPORTING |
| | DOCUMENT WITH REQUIRED ARCHITECT?S STAMP AND SIGNATURE, |
| | APPROVED AND ON SITE PRIOR TO FINAL INSPECTION. PROCEED |
| | AT YOUR OWN RISK. |
| | |
| | 2. PROVIDE THERMAL EXPANSION CONTROL FOR THE WATER |
| | HEATER COMPLYING WITH FBC PL 607.3; SEE PROVISO NOTE |
| | #1.B |
| | |
| | 3. SUBMIT A SLAB REPAIR DETAIL FOR REVIEW AND ONCE |
| | APPROVED HAVE TWO (2) COPIES AT THE JOB SITE PRIOR TO |
| | THE FIRST INSPECTION. SHOW THE WIDTH OF THE REPAIR, THE |
| | MINIMUM THICKNESS OF THE CONCRTETE TO BE REPLACED, AND |
| | THE PSI OF THE CONCRETE. SHOW THE SIZE AND LENGTH OF |
| | THE DOWELS, THE MINIMUM EMBEDMENT INTO THE EXISTING |
| | SLAB, THE ANCHORING MATERIAL FOR THE DOWELS AND THE |
| | SPACING OF THE DOWELS ON CENTER. THE REPAIR SHALL ALSO |
| | INCLUDE TERMITE TREATMENT OF THE SOIL AND THE REQUIRED |
| | VAPOR BARRIER OVER WELL COMPACTED SOIL. A COPY OF THE |
| | TERMITE CERTIFICATE SHALL BE ONSITE FOR THE FINAL |
| | INSPECTION |
| | |