| Plan Review Notes For Permit 19120500 |
| Permit Number |
19120500 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2020-06-22 14:19:02 | NEW BUILDING SHELL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PRODUCT APPROVAL (18-0129.06 AND 17-1218.09) LISTED | | | ON DRAWING A-6.0 FOR THE STOREFRONT GLAZING AND SGD | | | DOES NOT MEET THE LARGE MISSILE IMPACT REQUIREMENTS PER | | | FBC 1609.1.2 (1) - PLEASE PROVIDE PRODUCT APPROVAL FOR | | | THE REQUIRED SHUTTERS. | | | | | | | | | ITEMS TO PROVISO = | | | 1) WILL NEED TO PROVIDE SIGNED AND SEALED LOUVER SYSTEM | | | DETAILS TO COMPLY WITH THE DESIGN WIND LOADS. FBC 1609 | | | 2) WILL NEED TO PROVIDE SIGNED AND SEALED METAL CANOPY | | | DETAILS TO COMPLY WITH THE DESIGN WIND LOADS. FBC 1609 | | | 3) WILL NEED TO PROVIDE A SIGNED AND SEALED SOIL REPORT | | | (GEOTECHNICAL REPORT) TO VERIFY THE REQUIRED SOIL | | | BEARING CAPACITY PER NOTES ON THE DRAWINGS. | | | |
|