| Plan Review Notes For Permit 19111275 |
| Permit Number |
19111275 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-05-15 14:53:45 | PROVISOS: | | | PROVIDE ELEVATION CERTIFICATE WHILE UNDER CONSTRUCTION. | | | PROVIDE FORMBOARD SURVEY TO INSPECTOR PRIOR TO POURING | | | FOUNDATION. | | 2019-12-02 07:44:07 | PROVISOS: | | | 1) SEE DEFERRED SUBMITTALS LIST ON SHEET LS-0 | | | 2) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED | | | PRIOR TO C.O. | | | CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE. | | | 3) SHORING/RESHORE ENGINEERING IS REQUIRED TO BE | | | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE | | | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED | | | PRIOR TO CONCRETE POUR. | | | 4) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | | REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | ALL OTHER ITEMS OTHER THAN BMEP | | | 5) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | 6) FLOORING SUBMITTAL WITH SOUND IIC, STC AND FIRE | | | RATINGS. | | | 7) SUBMITTAL FOR VEHICLE BARRIER SYSTEM | | | 8) SUBMITTAL FOR HAND RAILS AND GUARD RAILS | | | 9) ROOFING PRODUCT APPROVALS AND ENGINEERING AT TIME OF | | | SUB-PERMIT APPLICATION. | | | 10) ROOF TRUSS SHOP DRAWINGS TO INSPECTOR PRIOR TO | | | INSTALL. | | | |
|