| 2019-12-02 17:46:22 | 12/02/2019 2ND PLUMBING/ REVIEW **DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | |
| | 1. ON P1 SHOWER AND TUB ARE LABELED AS FD PLEASE CHANGE |
| | TO CORRECT LABELS (TUB, SHOWER) PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | 2. SHOWER NEEDS TO BE RAN OFF THE WET VENT NOT OFF THE |
| | TUB DRAIN LINE PER THE 2017 FBC SEC. R3108.1 HORIZONTAL |
| | WET VENT PERMITTED. |
| | 3. THE PLANS ARE NOT SIGNED BY THE ARCHITECT OF RECORD, |
| | SIGNATURE OF AN ARCHITECT-ENGINEER IS REQUIRED (OR |
| | SEAL, OR TITLE BLOCK, OR ALL THREE) ARE NOT IN |
| | ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODE |
| | 61G15-23.001, FLORIDA STATUTE 471. |
| | 4. ROMAN TUB STANDALONE REQUIRED A CONTROL VALVE BY A |
| | WATER TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3, EXCEPT WHERE SUCH PROTECTION IS |
| | OTHERWISE PROVIDED BY A COMBINATION TUB/SHOWER VALVE IN |
| | ACCORDANCE WITH SECTION 2017 FBC SEC. 2708.4, R 2713.3 |
| | BATHTUB AND WHIRLPOOL BATHTUB VALVES. (ADD TO PLUMBING |
| | NOTES) |
| | 5. SHOWER CONTROL VALVES SHALL BE PRESSURE-BALANCED, |
| | THERMOSTATIC-MIXING OR COMBINATION |
| | PRESSURE-BALANCE/THERMOSTATIC-MIXING VALVE TYPES WITH A |
| | HIGH LIMIT STOP IN ACCORDANCE WITH ASSE 1016/ASME |
| | A112.1016/CSA B125.16. THE HIGH LIMIT STOP SHALL BE SET |
| | TO LIMIT THE WATER TEMPERATURE TO NOT GREATER THAN 120 |
| | F. (ADD TO PLUMBING NOTES) |
| | 6. IF THE SHOWER PAN IS NOT RECEDED IT WILL REQUIRE |
| | LINING. THE ADJOINING WALLS AND FLOOR FRAMING ENCLOSING |
| | ON-SITE BUILT-UP SHOWER RECEPTORS SHALL BE LINED WITH |
| | ONE OF THE FOLLOWING MATERIALS. THE LINING MATERIAL |
| | SHALL EXTEND NOT LESS THAN 2 INCHES BEYOND OR AROUND |
| | THE ROUGH JAMBS AND NOT LESS THAN 2 INCHES ABOVE |
| | FINISHED THRESHOLDS. SHEET-APPLIED LOAD-BEARING, BONDED |
| | WATERPROOF MEMBRANES SHALL BE APPLIED IN ACCORDANCE |
| | WITH THE MANUFACTURER'S INSTRUCTIONS PER 2017 FBC SEC. |
| | R 2709.2. |
| | 7. SHOWER PAN MUST HAVE A SLOPED MORTAR BED THAT IS |
| | PRE-PITCHED BENEATH PRIOR TO LINER INSTALLATION OF 1/4" |
| | IN PER FOOT TOWARD THE DRAIN, MUST HAVE DAM CORNER, |
| | BACKING AROUND THE PERIMETER AND BEFORE FINAL MORTAR |
| | APPLICATION PLACE SOME PEA GRAVEL OVER WEEP HOLES SO |
| | THE MORTAR DOES NOT COVER THEM PER MANUFACTURES |
| | SPECIFICATIONS. |
| | 8. PLEASE SHOW A DETAIL OF THE SHOWER LINER |
| | INSTALLATION AND IF YOU ARE USING AN ALTERNATE METHOD |
| | IS MUST BE APPROVED AT THIS STAGE SO PROVIDE |
| | DOCUMENTATION FOR ALTERNATE PRODUCTS. |
| | 9. HOT WATER RAN UNDER SLAB IN AN UN-CONDITION SPACE |
| | SHALL BE INSULATED PER THE 2017 FBC EC RE 403.5.3. |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |