| Date |
Text |
| 2020-01-13 09:16:30 | PLUMBING 2ND REVIEW**DENIED**19110910 |
| | 1) SHT. S6 PLEASE SHOW THE MIRROR 40?MAX AS TO THE |
| | REFLECTIVE SURFACE NOT THE BOTTOM EDGE OF MIRROR. |
| | FBC-ACC 603.3. |
| | 2) SHOW TOILET PAPER HOLD AS BEING 7?-9? FROM THE FRONT |
| | EDGE OF THE TOILET. FBC-ACC 604.7 |
| | 3) PLEASE PROVIDE THE GRAB BAR DETAIL MEASUREMENTS AS |
| | CALLED OUT IN FBC-ACC 604.5.1, 604.5.2 |
| | 4) (A) SHOW THE ADA SHOW AS A TRANSFER SHOWER NOT AS |
| | ADA. THE 36? IS NOT THE MIN THIS IS AN ABSOLUTE |
| | MEASUREMENT. FBC-ACC 608.2 |
| | (B) THE GRAB BAR SHALL BE MEASURED TO THE TOP OF THE |
| | GRIPPING SURFACE NOT TO THE CENTER. FBC-ACC 609.4 |
| | (C) SHOW SHOWER PAN MATERIAL BEING USED. FBC-PLB |
| | 417.5.2 |
| | (D) THE CONTROL WALL SHALL BE ACROSS FROM THE TRANSFER |
| | SHOWER SEAT NOT ADJACENT TO THE SEAT AS SHOWN. FBC-ACC |
| | 608.2.1 |
| | (E) HEIGHT FOR THE SHOWER VALVE AND SHOWER HEAD/ HAND |
| | HELD SHALL BE MAX 48?. FBC-ACC 608.6 |
| | (F) SHOW THE PRE-PITCH OF THE SHOWER AS 2% / ?? PER |
| | FOOT MIN. FBC-PLB 417.5.2 |
| | 5) THE WATER HEATER RELIEF LINE SHALL DISCHARGE INTO |
| | THE DRAIN PAN WITH IN THE ROOM. FBC-PLB 504.6 |
| | 6) PAN DRAIN MATERIAL SHALL BE OF MATERIALS CALLED OUT |
| | IN THE WATER DISTRIBUTION TABLE FBC-PLB 605.4. PVC |
| | PIPING IS NOT PERMITTED. |
| | 7) SHOW ALL HOT WATER PIPING AS BEING INSULATED AS |
| | CALLED OUT IN FBC-ENERGY C404.4. |
| | 8) PROVIDE MEANS OF THERMO EXPANSION. FBC-PLB 607.3 |
| | |
| | TIM HUNT |
| | PLUMBING PLAN REVIEW |
| | CITY OF WEST PALM BEACH (CGA SOLUTIONS) |
| | 561-248-2703 |
| | [email protected] |
| | |
| | |