| 2019-12-18 12:02:28 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #19110910 |
| | 12/18/19 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) REQUIRED CALCULATIONS FOR THE PROJECT |
| | |
| | A) AC COOLING AND HEATING CALCULATIONS IN ACCORDANCE |
| | WITH SECTION C403.2.1 FBC EC. |
| | |
| | B) ENERGY CALCULATIONS- THE PROPOSED PROJECT IS |
| | CLASSIFED AS A CHANGE OF OCCUPANCY, AND IS ALSO A |
| | PREVIOUSLY UNCONDITONED SPACE NOW BEING CONDITIONED. |
| | REFER TO SECTIONS C101.4.5, C503.2 , & C505.1 AND |
| | SUBMIT AN ENERGY COMPLIANCE REPORT. |
| | |
| | 2) SHEET M1: PLEASE PROVIDE NEW ROOM AND AREA |
| | IDENTIFICATIONS FOR THE "EXISTING WAREHOUSE AND |
| | EXISTING LOADING" SPACES. IN ORDER TO PROVIDE PROPER |
| | VENTILATION, ITS IS IMPORTANT TO INDICATE WHAT |
| | ACTIVITIES WILL OCCUR IN THESE AREAS- SECTION 107.2.1 |
| | WPB. |
| | |
| | 3) M1, NEW WORK SHOP: PROVIDE O/A AND EXHAUST |
| | VENTILATION CALCULATIONS FOR THE SHOP PER TABLE |
| | 403.3.1.1 FBC M. CLARIFY WHAT FUNCTIONS OR PROCESSES |
| | OCCUR IN THE SHOP- SECTION 107.2.1 WPB. |
| | |
| | 4) M1: PROVIDE AN EQUIPMENT SCHEDULE FOR THE ERV SYSTEM |
| | ON THE PLAN.- SEE SECTION C403.2.7 FBC EC. |
| | |
| | 5) MISSING PLANS AND DETAILS- SECTION 107.2.1 WPB |
| | |
| | A) RCP |
| | |
| | B) AIR DISTRIBUTION AND AIR DEVICE SCHEDULE. |
| | |
| | C) ENLARGED GENERATOR ROOM PLAN. THERE ARE NO |
| | SPECIFICATIONS SUBMITTED FOR THE GENERATOR. CLARIFY IF |
| | THE SYSTEM IS TO BE UNDER THIS PERMIT OR SEPARATE |
| | PERMIT. PLEASE NOTE THAT A COMPLETE SUBMITTAL PACKAGE |
| | AND COMPLETE ELECTRICAL AND MECHANICAL DRAWINGS ARE |
| | REQUIRED- SECTION 107.2.1 WPB. |
| | |
| | D) AIR HANDLER SUPPORT DETAILS. |
| | |
| | E) PRIMARY AND SECONDARY CONDENSATE DISPOSAL |
| | |
| | 6) M1 & S5: THE CONDENSERS ON THE NEW SHOP ROOF APPEAR |
| | TO BE LESS THAN 10' FROM THE ROOF EDGE WHICH WOULD |
| | REQUIRE GUARDS TO BE INSTALLED- SEE SECTION 304.11 FBC |
| | M. |
| | |
| | 7) M1 & S5: AN ACCESS PLATFORM IS REQUIRED FOR THE |
| | CONDENSERS MOUNTED ON THE EXTERIOR WALLS PER SECTION |
| | 306.1 FBC M. PLEASE NOTE THAT A PERMANENT LADDER IS |
| | REQUIRED IF THE CONDENSERS ARE MOUNTED HIGHER THAN 16' |
| | FROM GRADE- SECTION 306.5 FBC M. |
| | |
| | 8) PROVIDE COMPLETE WIND LOAD ENGINEERING FOR |
| | INSTALLATION OF THE ROOF AND WALL MOUNTED CONDENSERS- |
| | SECTION 301.15 FBC M. SUBMIT MIAMI-DADE NOA'S AND/OR |
| | FL. PRODUCT APPROVALS FOR THE CONDENSER STANDS AND WALL |
| | BRACKET- RULE 9N-3 FAC. |
| | |
| | 9) THE $616,520.00 PROJECT VALUE APPEARS LOW FOR A |
| | 20515 SF. RENOVATION. PLEASE PROVIDE SA COPY OF THE |
| | CONTRACT AND AN ITEMIZED COST BREAKDOWN FOR THE ENTIRE |
| | PROJECT. THE TOTAL VALUE IS BASED ON LABOR, MATERIALS, |
| | EUIPMENT AND FIXTURES FOR ALL TRADES AND PHASES OF THE |
| | PROJECT, AND SHALL ALSO INCLUDE SITE WORK AND DESIGN |
| | FEES- SECTION 109.3 WPB.THAT INCLUDES ALL OF THE TRADE |
| | COSTS, |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |