Plan Review Notes
Plan Review Notes For Permit 19110910
Permit Number 19110910
Review Stop M
Sequence Number 1
Notes
Date Text
2019-12-18 12:02:281ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19110910
 12/18/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) REQUIRED CALCULATIONS FOR THE PROJECT
  
 A) AC COOLING AND HEATING CALCULATIONS IN ACCORDANCE
 WITH SECTION C403.2.1 FBC EC.
  
 B) ENERGY CALCULATIONS- THE PROPOSED PROJECT IS
 CLASSIFED AS A CHANGE OF OCCUPANCY, AND IS ALSO A
 PREVIOUSLY UNCONDITONED SPACE NOW BEING CONDITIONED.
 REFER TO SECTIONS C101.4.5, C503.2 , & C505.1 AND
 SUBMIT AN ENERGY COMPLIANCE REPORT.
  
 2) SHEET M1: PLEASE PROVIDE NEW ROOM AND AREA
 IDENTIFICATIONS FOR THE "EXISTING WAREHOUSE AND
 EXISTING LOADING" SPACES. IN ORDER TO PROVIDE PROPER
 VENTILATION, ITS IS IMPORTANT TO INDICATE WHAT
 ACTIVITIES WILL OCCUR IN THESE AREAS- SECTION 107.2.1
 WPB.
  
 3) M1, NEW WORK SHOP: PROVIDE O/A AND EXHAUST
 VENTILATION CALCULATIONS FOR THE SHOP PER TABLE
 403.3.1.1 FBC M. CLARIFY WHAT FUNCTIONS OR PROCESSES
 OCCUR IN THE SHOP- SECTION 107.2.1 WPB.
  
 4) M1: PROVIDE AN EQUIPMENT SCHEDULE FOR THE ERV SYSTEM
 ON THE PLAN.- SEE SECTION C403.2.7 FBC EC.
  
 5) MISSING PLANS AND DETAILS- SECTION 107.2.1 WPB
  
 A) RCP
  
 B) AIR DISTRIBUTION AND AIR DEVICE SCHEDULE.
  
 C) ENLARGED GENERATOR ROOM PLAN. THERE ARE NO
 SPECIFICATIONS SUBMITTED FOR THE GENERATOR. CLARIFY IF
 THE SYSTEM IS TO BE UNDER THIS PERMIT OR SEPARATE
 PERMIT. PLEASE NOTE THAT A COMPLETE SUBMITTAL PACKAGE
 AND COMPLETE ELECTRICAL AND MECHANICAL DRAWINGS ARE
 REQUIRED- SECTION 107.2.1 WPB.
  
 D) AIR HANDLER SUPPORT DETAILS.
  
 E) PRIMARY AND SECONDARY CONDENSATE DISPOSAL
  
 6) M1 & S5: THE CONDENSERS ON THE NEW SHOP ROOF APPEAR
 TO BE LESS THAN 10' FROM THE ROOF EDGE WHICH WOULD
 REQUIRE GUARDS TO BE INSTALLED- SEE SECTION 304.11 FBC
 M.
  
 7) M1 & S5: AN ACCESS PLATFORM IS REQUIRED FOR THE
 CONDENSERS MOUNTED ON THE EXTERIOR WALLS PER SECTION
 306.1 FBC M. PLEASE NOTE THAT A PERMANENT LADDER IS
 REQUIRED IF THE CONDENSERS ARE MOUNTED HIGHER THAN 16'
 FROM GRADE- SECTION 306.5 FBC M.
  
 8) PROVIDE COMPLETE WIND LOAD ENGINEERING FOR
 INSTALLATION OF THE ROOF AND WALL MOUNTED CONDENSERS-
 SECTION 301.15 FBC M. SUBMIT MIAMI-DADE NOA'S AND/OR
 FL. PRODUCT APPROVALS FOR THE CONDENSER STANDS AND WALL
 BRACKET- RULE 9N-3 FAC.
  
 9) THE $616,520.00 PROJECT VALUE APPEARS LOW FOR A
 20515 SF. RENOVATION. PLEASE PROVIDE SA COPY OF THE
 CONTRACT AND AN ITEMIZED COST BREAKDOWN FOR THE ENTIRE
 PROJECT. THE TOTAL VALUE IS BASED ON LABOR, MATERIALS,
 EUIPMENT AND FIXTURES FOR ALL TRADES AND PHASES OF THE
 PROJECT, AND SHALL ALSO INCLUDE SITE WORK AND DESIGN
 FEES- SECTION 109.3 WPB.THAT INCLUDES ALL OF THE TRADE
 COSTS,
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  