Plan Review Notes
Plan Review Notes For Permit 19110804
Permit Number 19110804
Review Stop FIRE
Sequence Number 1
Notes
Date Text
2019-11-25 15:01:49THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) THERE NO INDICATIONS OF THE INSTALLATION COMPLYING
 WITH ANY NFPA CODE.
  
 THE INSTALLATION SHALL COMPLY WITH NFPA 30A AND ALL
 OTHER APPLICABLE CODES
  
 CHAPTER 1 ADMINISTRATION
 1.1* SCOPE.
 1.1.1 SCOPE. THIS CODE SHALL APPLY TO MOTOR FUEL
 DISPENSING
 FACILITIES AND MOTOR FUEL DISPENSING AT FARMS AND
 ISOLATED CONSTRUCTION
 SITES.
  
 PLEASE REIVEW, ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE NOTE;
  
  
 2) THERE ARE INDICATIONS OF DIMENSIONS FOROM NEAREST
 BUILDINGS
  
 PER NFPA 30A
  
 4.3.2* ABOVEGROUND STORAGE TANKS. EXCEPT AS MODIFIED BY
 THE
 PROVISIONS OF THIS SUBSECTION, ABOVEGROUND STORAGE
 TANKS SHALL
 MEET ALL APPLICABLE REQUIREMENTS OF CHAPTERS 21 AND 22
 OF
 NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE.
 4.3.2.1 THE USE OF ABOVEGROUND STORAGE TANKS AT MOTOR
 FUEL
 DISPENSING FACILITIES, FLEET VEHICLE MOTOR FUEL
 DISPENSING FACILITIES,
 AND MARINE MOTOR FUEL DISPENSING FACILITIES SHALL BE
 PERMITTED WHEN INSTALLED IN ACCORDANCE WITH THE
 REQUIREMENTS
 OF THIS SUBSECTION AND WITH ALL APPLICABLE REQUIREMENTS
 OF CHAPTERS 21, 22, AND 27 OF NFPA 30, FLAMMABLE AND
 COMBUSTIBLE LIQUIDS CODE, AND, FOR TANKS OTHER THAN
 TANKS IN
 VAULTS, WHEN THE SPECIFIC INSTALLATION HAS BEEN
 APPROVED BY
 THE AUTHORITY HAVING JURISDICTION.
  
 NFPA 30
  
 22.4* LOCATION OF ABOVEGROUND STORAGE TANKS.
 22.4.1 LOCATION WITH RESPECT TO PROPERTY LINES, PUBLIC
 WAYS,
 AND IMPORTANT BUILDINGS.
 22.4.1.1 TANKS STORING CLASS I, CLASS II, OR CLASS IIIA
 STABLE
 LIQUIDS WHOSE INTERNAL PRESSURE IS NOT PERMITTED TO
 EXCEED A
 GAUGE PRESSURE OF 2.5 PSI (17 KPA) SHALL BE LOCATED IN
 ACCORDANCE
 WITH TABLE 22.4.1.1(A) AND TABLE 22.4.1.1(B). WHERE
 TANK SPACING IS BASED ON A WEAK ROOF-TO-SHELL SEAM
 DESIGN, THE
 USER SHALL PRESENT EVIDENCE CERTIFYING SUCH
 CONSTRUCTION TO THE
 AUTHORITY HAVING JURISDICTION UPON REQUEST.
  
 PLEASE PROVIDE DIMENSIONS COMPLYING WITH THE MINIMUM
 DIEMSIONS.
  
  
 3) THE INSTALLATION AND TESTING OF PIPING SHALL BE PER
 NFPA 30 CH 27
  
 27.3 GENERAL REQUIREMENTS.
 27.3.1 PERFORMANCE STANDARDS. THE DESIGN, FABRICATION,
 ASSEMBLY,
 TEST, AND INSPECTION OF PIPING SYSTEMS SHALL BE
 SUITABLE
 FOR THE WORKING PRESSURES AND STRUCTURAL STRESSES TO BE
 ENCOUNTERED
 BY THE PIPING SYSTEM. COMPLIANCE WITH APPLICABLE
 SECTIONS
 OF ASME B31, CODE FOR PRESSURE PIPING, AND THE
 PROVISIONS
 OF THIS CHAPTER SHALL BE CONSIDERED PRIMA FACIE
 EVIDENCE OF COMPLIANCE
 WITH THE FOREGOING PROVISIONS.
  
 PLEASE REVIEW, ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE NOTE.
  
  
 4) THERE AR NO EQUIPMENT MANUFACTURE SPEC SHEETS NOR A
 TANK MANUFACTURE SPEC SHEET ATTACHED.
  
 PLEASE SUBMIT THE APPLICABLE EQUIPMENT SPEC SHEETS FOR
 THE PROPOSED PROJECT,
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  