| 2019-11-18 14:26:41 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | |
| | 1) THERE ARE INCORRECT REFERNECES TO THE CURRENT FIRE |
| | CODE EDITIONS. |
| | |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 6TH EDITION OF FLORIDA FIRE PREVENTION CODE WHICH |
| | INCLUDES THE 2015 EDITION OF NFPA 1 AND NFPA 101. |
| | |
| | THE BELOW LIST ARE THE MOST COMMON REFERENCED CODES: |
| | |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2013 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2013 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2013 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2013 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2014 EDITION. |
| | |
| | PLEASE UPDATE YOYR RECORDS TO REFLECT THE CURRENT |
| | EDITIONS OF THE FIRE CODES.REVIEW AND COMPLIANCE. |
| | |
| | |
| | |
| | 2) ANY REMOVAL AND/OR CONSTRUCTION OF WALLS AND /OR |
| | CEILINGS REQUIRE AN EVALUATION OF THE FIRE ALARM AND/OR |
| | FIRE SPRINKLER SYSTEMS BY APPLICABLE LICENSED |
| | CONTRACTORS FOR CODE COVERAGE COMPLIANCE. |
| | |
| | |
| | 3) ANY AND ALL WORK ON THE FIRE ALARM AND/OR FIRE |
| | SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE PERMITS |
| | AND SHOP DRAWINGS. |
| | |
| | |
| | 4) THE EXISTING LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR |
| | FIRE SPRINKLER SHALL BE MAINTAINED AND REMAIN ACTIVE |
| | THROUGHOUT THE CONSTRUCTION PERIOD. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | WEST PALM BEACH FIRE RESCUE |
| | 561-804-4709 |