| 2019-11-20 11:14:42 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) SHEET G 100 - THERE ARE NO INDICATIONS OF REVIEW OR |
| | COMPLIANCE WITH THE FLORIDA FIRE PREVENTION CODE. |
| | |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 6TH EDITION OF FLORIDA FIRE PREVENTION CODE WHICH |
| | INCLUDES THE 2015 EDITION OF NFPA 1 AND NFPA 101. |
| | |
| | THE BELOW LIST ARE THE MOST COMMON REFERENCED CODES: |
| | |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2013 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2013 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2013 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2013 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2014 EDITION. |
| | |
| | PLEASE REVIEW AND ENSURE COMPLIANCE AS THESE ARE WHAT |
| | THE PROJECT WILL BE INSPECTED WITH. |
| | |
| | |
| | |
| | 2) SHEET FA 100 - THE PROPOSED FIRE ALARM SHALL BE |
| | INSTALLED UNDER SEPARATE SUBMITTED PERMIT AND SHOP |
| | DRAWINGS BY CERTIFIED FA CONTRACTOR. |
| | |
| | PLEASE ENSURE COMPLIANCE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |