| Plan Review Notes For Permit 19101274 |
| Permit Number |
19101274 |
|
| Review Stop |
E |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2020-03-02 08:28:36 | SORRY I MISSED THIS ON FIRST REVIEW JLEAHY | | | | | | | | | 1. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR | | | SERVICE INCLUDING INFORMATION FROM THE POWER COMPANY | | | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR | | | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE | | | SERVICE EQUIPMENT IS ADEQUATE. NEC 110.9, 110.10 | | | 2. PROVIDE AIC RATING OF ANY SERVICE DISCONNECTS AND | | | PANELS. NEC 110.3, 110.9 | | | 3. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF | | | SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND | | | AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24 | | | 4. PROVIDE SERVICE AREA RECEPTACLE. NEC 210.64 | | | 5. PROVIDE EXTERIOR LIGHTING CONTROLS AS SPECIFIED IN | | | THE FBC ENERGY CONSERVATION. FBC EC C405.2.5 | | | 6. PROVIDE RISER DIAGRAM, SHOWING ALL DETAILS OF | | | SERVICE EQUIPMENT, UNDERGROUND OR OVERHEAD SERVICE, | | | WIRE AND BREAKER SIZES FOR SERVICE AND FEED TO ANY | | | SUB?PANEL(S). SHOW GEC SIZE AND SYSTEM, SHOW | | | INTERSYSTEM BONDING TERMINATION POINT. NEC 215.5, 230, | | | 250.50, 250.94, 408.30 |
|