| 2019-12-16 14:47:57 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) THE INSTALLATION SHALL COMPLY WITH NFPA 101, CH 7, |
| | MEANS OF EGRESS. |
| | |
| | 7.2.1.5.6 ELECTRICALLY CONTROLLED EGRESS DOOR |
| | ASSEMBLIES. DOOR |
| | ASSEMBLIES IN THE MEANS OF EGRESS SHALL BE PERMITTED TO |
| | BE |
| | ELECTRICALLY LOCKED IF EQUIPPED WITH APPROVED, LISTED |
| | HARDWARE, |
| | PROVIDED THAT ALL OF THE FOLLOWING CONDITIONS ARE MET: |
| | (1) THE HARDWARE FOR OCCUPANT RELEASE OF THE LOCK IS |
| | AFFIXED TO |
| | THE DOOR LEAF. |
| | (2) THE HARDWARE HAS AN OBVIOUS METHOD OF OPERATION |
| | THAT IS |
| | READILY OPERATED IN THE DIRECTION OF EGRESS. |
| | (3) THE HARDWARE IS CAPABLE OF BEING OPERATED WITH ONE |
| | HAND IN |
| | THE DIRECTION OF EGRESS. |
| | (4) OPERATION OF THE HARDWARE INTERRUPTS THE POWER |
| | SUPPLY |
| | DIRECTLY TO THE ELECTRIC LOCK AND UNLOCKS THE DOOR |
| | ASSEMBLY IN |
| | THE DIRECTION OF EGRESS. |
| | (5) *LOSS OF POWER TO THE LISTED RELEASING HARDWARE |
| | AUTOMATICALLY UNLOCKS THE DOOR ASSEMBLY IN THE |
| | DIRECTION OF |
| | EGRESS. |
| | (6) HARDWARE FOR NEW INSTALLATIONS IS LISTED IN |
| | ACCORDANCE WITH |
| | ANSI/UL 294, STANDARD FOR ACCESS CONTROL SYSTEM UNITS. |
| | 7.2.1.5.7 WHERE PERMITTED IN CHAPTERS 11 THROUGH 43, |
| | KEY |
| | OPERATION SHALL BE PERMITTED, PROVIDED THAT THE KEY |
| | CANNOT BE |
| | REMOVED WHEN THE DOOR LEAF IS LOCKED FROM THE SIDE FROM |
| | WHICH |
| | EGRESS IS TO BE MADE. |
| | 7.2.1.5.8* EVERY DOOR ASSEMBLY IN A STAIR ENCLOSURE |
| | SERVING MORE |
| | THAN FOUR STORIES, UNLESS PERMITTED BY 7.2.1.5.8.2, |
| | SHALL MEET ONE |
| | OF THE FOLLOWING CONDITIONS: |
| | (1) RE-ENTRY FROM THE STAIR ENCLOSURE TO THE INTERIOR |
| | OF THE |
| | BUILDING SHALL BE PROVIDED. |
| | (2) AN AUTOMATIC RELEASE THAT IS ACTUATED WITH THE |
| | INITIATION OF |
| | THE BUILDING FIRE ALARM SYSTEM SHALL BE PROVIDED TO |
| | UNLOCK ALL |
| | STAIR ENCLOSURE DOOR ASSEMBLIES TO ALLOW RE-ENTRY |
| | (3) SELECTED RE-ENTRY SHALL BE PROVIDED IN ACCORDANCE |
| | WITH 7.2.1.5.8.1 |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |