Plan Review Notes
Plan Review Notes For Permit 19100217
Permit Number 19100217
Review Stop M
Sequence Number 4
Notes
Date Text
2020-01-16 16:20:21 
 01/16/2020 MET WITH MIRIAM. TOLD HER I NEED THE SECOND
 COPY OF DRAWING M.1 IN ORDER TO APPROVE MECHANICAL
 REVIEW WITH THE PROVISO. ONLY ONE COPY WAS SUBMITTED.
  
  
 RESIDENTIAL (R3) ADDITION FOURTH MECHANICAL REVIEW
 CHECKLIST.
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 ORIGINAL COMMENT:
 1- PROVIDE COMPLETE INFORMATION FOR THE MECHANICAL WORK
 (LOAD CALCULATIONS AND PLANS). SEC. 1101.1 FBC-EXISTING
 BUILDING AND SEC. R403.7 FBC-ENERGY CONSERVATION.
 NOTE: SPECIFY THE EQUIPMENT MANUFACTURER AND MODEL AS
 REQUIRED BY SEC. R403.7.1 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
 A) EQUIPMENT LOAD CALCULATIONS SUBMITTED ARE DONE BASED
 ON THE FRONT DOOR FACING SOUTH. THIS IS INCORRECT.
 CALCULATIONS NEED TO BE DONE BASED ON THE ACTUAL
 ORIENTATION OF THE BUILDING AS REQUIRED BY SEC.
 R403.7.1 FBC-ENERGY CONSERVATION. THE MAIN ENTRY DOOR
 IS FACING EAST. REVISE AS REQUIRED. NOTE: COORDINATE
 WITH COMMENTS DONE ON THE ENERGY CALCULATIONS UNDER THE
 BUILDING REVIEW COMMENTS.
  
 B) DRAWING M.1 SUBMITTED. REVISE THE NORTH ORIENTATION
 ARROW TO MATCH PLANS AND SURVEY
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 IN ORDER TO AVOID MULTIPLE SUBMITTALS, PLEASE FEEL FREE
 TO CONTACT ME IF YOU HAVE ANY QUESTIONS REGARDING THESE
 COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved