| 2020-01-16 13:56:45 | BUILDING REVIEW APPROVED WITH PROVISO: |
| | (NOTE: PROVIDE INFORMATION FOR REVIEW PRIOR TO |
| | INSPECTIONS TO AVOID CONFLICTS/DELAYS): |
| | 1- REVISE ENERGY CALCULATIONS: |
| | (A)PROVIDE CORRECT OWNER'S NAME. |
| | (B)PROVIDE BUILDER'S NAME. |
| | (C)PROVIDE CORRECT JURISDICTION NUMBER (604700). |
| | (D)REVISE DOOR INFORMATION PAGE 3 OF 4. DOOR NOA |
| | 17-1212.10 SUBMITTED IS FOR GLAZED DOOR. THIS DOOR |
| | NEEDS TO BE IN WINDOW GLAZING AREA. SEC. R405.5.3.3 |
| | FBC-ENERGY CONSERVATION. AND DOOR IS LOCATED ON THE |
| | WEST SIDE NOT NORTH SIDE. SEE PLANS AND REVISE AS |
| | REQUIRED. |
| | E) REVISE WINDOWS ORIENTATION AND OVERHANG DEPTH AND |
| | SEPARATION TO MATCH PLANS. |
| | |
| | 2- DOOR NOA 17-1212.10 DON'T HAVE IMPACT GLAZING. |
| | PROVIDE SHUTTERS PRODUCT APPROVAL (2 COPIES) AND |
| | COMPLETE INSTALLATION SCHEDULE. |
| | |
| | 3- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS (DOORS, |
| | WINDOWS, SHINGLES, SHUTTERS). |
| | |
| | 4- REVISE AND RE-SUBMIT TRUSS PACKAGE: |
| | (A)TRUSS ENGINEER TO REVISE THE TRUSS DESIGN CRITERIA. |
| | BUILDING IS LOCATED IN EXPOSURE "C" NOT "B". SEE PLANS |
| | AND REVISE AS REQUIRED. |
| | (B)ENGINEER OF RECORD NEED TO REVIEW AND APPROVED THE |
| | TRUSS PACKAGE BEFORE SUBMITTAL. |
| | |