| Date |
Text |
| 2019-10-28 09:20:26 | PLUMBING 1ST REVIEW**DENIED**19091166 |
| | |
| | 1) SHT ADA1.1 DETAIL #4 PLEASE SHOW 40? MAX IS TO THE |
| | REFLECTIVE SURFACE AND NOT THE BOTTOM OF THE MIRROR. |
| | FBC-ACC 603.3 |
| | 2) SHT ADA1.1 DETAIL #3 SHOW THE 7?-9? TO THE FIRST |
| | ROLL AND NOT TO THE CENTER OF MUILT ROLL DISPENSER. |
| | REFER TO FBC-ACC 604.7 |
| | 3) ALL NOTE ALL HOT WATER AND RETURN HOT WATER SHALL BE |
| | INSULATED WITH MIN 1? WALL AND FOLLOW SIZING PER |
| | FBC-ENERGY C404.4. |
| | 4) SHT. P106 L-2 IN MEN?S AND WOMEN?S TOILET ROOM NOT |
| | SHOWN ON WATER RISER. FBC 107.3.5 |
| | 5) SHT. P106 EMPLOYEE TOILET ROOM FIXTURES L-3 & W-3ARE |
| | LABELED AS L-2 & L-3 ON WATER ISO. PLEASE CLARIFY. FBC |
| | 107.2.1 |
| | 6) P-165 IS SHOWN ON THE RISER BUT NOT ON THE FLOOR |
| | PLAN SHT.201 |
| | 7) P-406 SHOWN ON FLOOR PLAN ON SHT. P201 BUT NOT ON |
| | WATER ISO. PLEASE CLARIFY FBC 107.2.1 |
| | 8) SHT.P107 CLEAN-OUTS ARE REQUIRED IN WASTE STACKS, |
| | MOP SINKS, FLOOR DRAINS IN THE KITCHEN AREA AND SHALL |
| | DISCHARGE INTO THE GREASE SYSTEM. FBC-107.3.5 |
| | 9) P-107 IS THIS SUPPOSE TO BE AN ISLAND VENT? PLEASE |
| | CLARIFY 107.2.1 |
| | 10) P-107 LAVATORIES L-2 IN MEN?S AND WOMEN?S TOILETS |
| | ROOMS ARE LABELED AS L-1 ON SANITARY RISER. PLEASE |
| | CLARIFY. FBC 107.2.1 |
| | 11) P-107 LAVATORY L-3 IN EMPLOYEE TOILET ROOM IS |
| | LABELED AS L-1 ON SANITARY RISER. PLEASE CLARIFY. FBC |
| | 107.2.1 |
| | 12) SHT. EM 1.1 OCCUPANT LOAD IS LISTED AS 261 BUT |
| | FIXTURES LOAD IS LISTED AS 278. PLEASE CLARIFY FBC |
| | 107.2.1. |
| | 13) SHT. SP1.1 KEYNOTE #9 CALLS OUT EXISTING WALL |
| | HYDRANT TO REMAIN BUT THIS LINE IS A SPRINKLER LINE. |
| | PLEASE CLARIFY. FBC 107.2.1 |
| | 14) FOOD SERVICE DRAWINGS SHALL BE SIGNED AND SEALED. |
| | F.S 471,481 |
| | 15) 3- COMPARTMENT AND 2-COMPARTMENT SINKS SHALL BE |
| | PIPED INDEPENDENTLY TO THE FLOOR SINK. FBC-PLB 802.1.1 |
| | 16) PLEASE ADD NOTE BACKFLOW DEVICE REQUIRED ON ALL |
| | REQUIRED EQUIPMENT. |
| | 17) SHT. P100 CALLS OUT HOT WATER DEMAND PIPING TO |
| | PUBLIC LAVS TO BE 140F. ALL HAND WASH SINKS SHALL BE |
| | TEMPERED BY AN APPROVED ASSE 1070 DEVICE TO A MAX TEMP |
| | OF 110F. FBC-PLB 607.1.2 |
| | 18) SHT. P107 SANITARY ISOMETRIC PLEASE SIZE ALL PIPING |
| | INCLUDING VENTS. FBC 107.3.5 |
| | 19) SHT.P104 DETAIL #8 TEMPERING VALVES SHALL BE AN |
| | APPROVED ASSE 1070 VALVE. |
| | 20) SHT. P104 BACKFLOW SCHEDULE. PLEASE NOTE ALL |
| | BACKFLOWS ARE REQUIRED TO BE LEAD FREE. THE 975 XL |
| | CALLED OUT IS NOT LEAD FREE. NSF 61 AND WPB CROSS |
| | CONNECTION MANUAL 2017. |
| | 21) NOTE ON PLAN ALL NEW MAIN BACKFLOW AND GREASE |
| | INTERCEPTOR REQUIRED SEPARATE PERMITS. FBC 105.1 |
| | 22) SHT. 101 UNDER INSPECTIONS TEST REQUIREMENTS YOU |
| | CALL OUT AIR. AIR TEST IS NOT PERMITTED ON PLASTIC |
| | PIPING. FBC 312 |
| | 23) SHT.101 TOTAL SINK AND EQUIPMENT GPM CAPACITY I |
| | COME UP WITH 172. PLEASE CLARIFY 107.2.1 |
| | TIM HUNT |
| | PLUMBING PLAN EXAMINER |
| | CITY OF WEST PALM BEACH ( CGA SOLUTIONS) |
| | [email protected] |
| | 561-248-2703 |
| | |