| Date |
Text |
| 2019-10-08 14:45:36 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #19090931 |
| | 10/8/2019 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH |
| | EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) INCOMPLETE MECHANICAL PLANS BY ENERGY HOUSE |
| | TECHNOLOGY FOR THE NEW ADDITION HAVE BEEN SUBMITTED. |
| | PLEASE PROVIDE A CLEAR PLAN DRAWN AT MINIMUM 1/8" SCALE |
| | THAT SHOWS THE LOCATIONS OF THE AIR HANDLER AND |
| | CONDENSER, AND INCLUDES AN EQUIPMENT SCHEDULE AND DUCT |
| | LAYOUT- SECTION 107.2.1 WPB. |
| | |
| | 2) REFER TO SECTION R403.7.1 FBC EC: THE SUBMITTED AC |
| | COOLING AND HEATING LOAD CALCULATIONS ARE INCOMPLETE. |
| | MISSING FROM THE PROJECT SUMMARY IS THE DIRECTIONAL |
| | ORIENTATION OF THE ADDITION AND THE COOLING AND HEATING |
| | EQUIPMENT SUMMARIES. |
| | |
| | 3) PROVIDE A COMPLETE ENERGY COMPLIANCE REPORT FOR THE |
| | NEW ADDITION USING EITHER THE PRECRIPTIVE COMPLIANCE |
| | PATH (FORM R402) OR THE PERFORMANCE PATH (R405 |
| | GENERATED BY ENERGYGAUGE SOFTWARE). THERE ARE MANY |
| | PAGES MISSING FROM THE CURRENT PERFORMANCE SUBMITTAL |
| | INCLUDING THE COVER PAGE AND THE COMPLIANCE DATA PAGES- |
| | SEE SECTION R101.5.1.1 FBC EC. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |