| Plan Review Notes For Permit 19090869 |
| Permit Number |
19090869 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-12-11 16:22:55 | 19090869 PROVISOS: | | | 1) SEE DEFERRED SUBMITTALS LIST ON SHEET A-0.4.1 | | | 2) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED | | | PRIOR TO C.O. | | | CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE. | | | 3) SHORING/RESHORE ENGINEERING IS REQUIRED TO BE | | | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE | | | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED | | | PRIOR TO CONCRETE POUR. | | | 4) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | | REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | ALL OTHER ITEMS OTHER THAN BMEP | | | 5) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | 6) FLOORING SUBMITTAL WITH SOUND IIC, STC AND FIRE | | | RATINGS. | | | 7) PROVIDE PRODUCT APPROVAL FOR ROOF HATCH AND LADDER | | | WITH 16 SQ. FT MINUMUM OPENING | | | AS REQUIRED BY FBC 1011.12 AND 1011.12.1 | | | | | 2019-12-06 10:31:40 | PENDING UPLOAD OF STRUCTURAL SHEETS. |
|