Plan Review Notes
Plan Review Notes For Permit 19090652
Permit Number 19090652
Review Stop P
Sequence Number 1
Notes
Date Text
2019-10-01 16:56:08PLUMBING 1ST REVIEW**DENIED**
 1) PLEASE CLARIFY AE YOU RUNNING NEW SEWER LINE TO EACH
 UNITS BUILDING DRAIN OR JUST INSTALLING THE LATERAL?
 FBC 107.2.1
 2) BEING THIS PROPERTIES IRRIGATION SYSTEM IS A COMMON
 SYSTEM FROM 1 WATER METER IT IS COMMERCIAL AND PER 2017
 WPB CROSS CONNECTION MANUAL THE BACKFLOW SHALL BE A
 LEAD FREE RPZ AND MUST BE INSTALLED WITH A SEPARATE
 PERMIT BY A LICENSED PLUMBING CONTRACTOR.
 3) INSTALLATION OF THE WATER SERVICE MAIN FROM THE
 METER UP TO THE BUILDING IS OUTSIDE THE SCOPE OF YOUR
 CUC LICENSE. SEE FLORIDA STATUE 489.105 (N). IT ALLOWS
 PIPING UP TO THE WATER METER BUT NOT BEYOND. THIS WORK
 IS ONLY PERMITTED TO BE COMPLETED BY A LICENSE PLUMBING
 CONTRACTOR. BELOW IS A COPY OF A UNDERGROUND
 CONTRACTORS SCOPE OF WORK PEMITTED:
 N)??UNDERGROUND UTILITY AND EXCAVATION CONTRACTOR?
 MEANS A CONTRACTOR WHOSE SERVICES ARE LIMITED TO THE
 CONSTRUCTION, INSTALLATION, AND REPAIR, ON PUBLIC OR
 PRIVATE PROPERTY, WHETHER ACCOMPLISHED THROUGH OPEN
 EXCAVATIONS OR THROUGH OTHER MEANS, INCLUDING, BUT NOT
 LIMITED TO, DIRECTIONAL DRILLING, AUGER BORING, JACKING
 AND BORING, TRENCHLESS TECHNOLOGIES, WET AND DRY TAPS,
 GROUTING, AND SLIP LINING, OF MAIN SANITARY SEWER
 COLLECTION SYSTEMS, MAIN WATER DISTRIBUTION SYSTEMS,
 STORM SEWER COLLECTION SYSTEMS, AND THE CONTINUATION OF
 UTILITY LINES FROM THE MAIN SYSTEMS TO A POINT OF
 TERMINATION *****UP TO AND INCLUDING THE METER
 LOCATION****FOR THE INDIVIDUAL OCCUPANCY, SEWER
 COLLECTION SYSTEMS AT PROPERTY LINE ON RESIDENTIAL OR
 SINGLE-OCCUPANCY COMMERCIAL PROPERTIES, OR ON
 MULTIOCCUPANCY PROPERTIES AT MANHOLE OR WYE LATERAL
 EXTENDED TO AN INVERT ELEVATION AS ENGINEERED TO
 ACCOMMODATE FUTURE BUILDING SEWERS, WATER DISTRIBUTION
 SYSTEMS, OR STORM SEWER COLLECTION SYSTEMS AT STORM
 SEWER STRUCTURES. HOWEVER, AN UNDERGROUND UTILITY AND
 EXCAVATION CONTRACTOR MAY INSTALL EMPTY UNDERGROUND
 CONDUITS IN RIGHTS-OF-WAY, EASEMENTS, PLATTED
 RIGHTS-OF-WAY IN NEW SITE DEVELOPMENT, AND SLEEVES FOR
 PARKING LOT CROSSINGS NO SMALLER THAN 2 INCHES IN
 DIAMETER IF EACH CONDUIT SYSTEM INSTALLED IS DESIGNED
 BY A LICENSED PROFESSIONAL ENGINEER OR AN AUTHORIZED
 EMPLOYEE OF A MUNICIPALITY, COUNTY, OR PUBLIC UTILITY
 AND THE INSTALLATION OF SUCH CONDUIT DOES NOT INCLUDE
 INSTALLATION OF ANY CONDUCTOR WIRING OR CONNECTION TO
 AN ENERGIZED ELECTRICAL SYSTEM. AN UNDERGROUND UTILITY
 AND EXCAVATION CONTRACTOR MAY NOT INSTALL PIPING THAT
 IS AN INTEGRAL PART OF A FIRE PROTECTION SYSTEM AS
 DEFINED IN S. 633.102 BEGINNING AT THE POINT WHERE THE
 PIPING IS USED EXCLUSIVELY FOR SUCH SYSTEM.
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH (CGA SOLUTIONS)
 561-248-2703
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved