| Plan Review Notes For Permit 19090546 |
| Permit Number |
19090546 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-11-19 10:50:02 | PLUMBING COMMENTS: APPROVED W/PROVISO | | | RE: PLAN SHEET R101; SHEET NOTE 1. ACKNOWLEDGED NO | | | CHANGE IN AREA BEING DRAINED/ NO CHANGE TO FLOW OF | | | WATER ENTERING THE SYSTEM. | | | RE: PLAN SHEET R102; SHEET NOTE 1. ACKNOWLEDGED NO | | | CHANGE IN AREA BEING DRAINED/ NO CHANGE TO FLOW OF | | | WATER ENTERING THE SYSTEM. | | | SEE PLAN SHEET R-502 FOR PLANTER DRAIN DETAILS AND NEW | | | DRAIN CONNECTION DETAILS. | | | PER WPB FBC 107.2.1, A DRAWING OF RECORD SHALL BE | | | SUBMITTED OF THE PLANTER DRAINAGE SYSTEMS NOTING ALL | | | ROUTING, AS WELL AS LOCATIONS OF SUPPLEMENTAL AND | | | REUSED DRAINS INCORPORATED INTO THE SYSTEMS. DRAWING | | | (S) SHALL INCLUDE SIZES OF PIPING AND POINTS OF | | | CONNECTION TO THE EXISTING VERTICAL STORM CONDUCTOR(S). | | | SAID DRAWING(S) SHALL BE SUBMITTED AS A REVISION TO THE | | | PERMIT PLANS AND SHALL BE IN PLACE PRIOR TO FINAL | | | INSPECTION. | | | A SEPARATE PLAN AND PERMIT IS REQUIRED FOR IRRIGATION. | | | (SEE PROVISO PERTAINING TO LANDSCAPING OM PLAN SHEET | | | R-101.) | | | |
|