| Date |
Text |
| 2019-12-11 18:13:35 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | |
| | 1) IF YOU DO NOT WISH TO APPLY FOR A SEPARATE PERMIT AS |
| | NOTED ON SHEET S-2 OF THE APPROVED PLANS, YOU HAVE TWO |
| | OTHER OPTIONS THAT ARE ACCEPTABLE. NUMBER ONE IS TO |
| | REVISE SHEET S-2 AND REMOVE THE NOTE AND CORRECT THE |
| | DIMENSIONS. NUMBER TWO IS TO PROVIDE A SIGNED AND |
| | SEALED LETTER FROM THE ENGINEER OF RECORD THAT SIGNED |
| | SHEET S-2, WHICH STATES THAT THE CHILLER SUPPORT SHOWN |
| | ON SHEET S-2 IS INCLUDED UNDER PERMIT #17121030 AND THE |
| | DIMENSIONS ARE REVISED AS SHOWN IN THE STRUCTURAL |
| | CALCULATION DOCUMENTS. ON SHEET S-2 OF THE APPROVED |
| | PLANS THERE ARE NOTES THAT INDICATE THE CHILLER SUPPORT |
| | WILL BE UNDER A SEPARATE PERMIT. THEREFORE, THESE |
| | DOCUMENTS ARE REQUIRED TO BE SUBMITTED AS A SEPARATE |
| | PERMIT. THIS SUBMITTAL NUMBER CAN BE CHANGED TO A |
| | PERMIT NUMBER. YOU WILL NEED TO HAVE THE CONTRACTOR |
| | THAT IS INSTALLING THE CHILLER STAND FILL OUT A PERMIT |
| | APPLICATION AND SUBMIT IT WITH THE OTHER DOCUMENTS. FBC |
| | 105.1 |
| | |
| | 2) COMPLIED. |
| | |
| | 3) SINCE BOTH THE 2014 AND 2017 EDITIONS OF THE FBC |
| | REFERENCE ASCE 7 - 10 FOR STRUCTURAL DESIGN, THE 2017 |
| | FBC IS ACCEPTABLE. THE PROJECT ASSOCIATED WITH THIS |
| | PERMIT WAS PERMITTED UNDER THE 2014 FBC FIFTH EDITION. |
| | THEREFORE, TO RETAIN CONSISTENCY THE DOCUMENTS FOR THIS |
| | PERMIT SHOULD USE THE SAME DESIGN CRITERIA. FBC 107.2.1 |
| | |
| | 4) SEE COMMENT NUMBER 1. THE NOTES ON SHEET S-2 OF THE |
| | APPROVED PLANS SPECIFY THAT THE CHILLER WILL BE MOUNTED |
| | ON A 4'-2" X 6'-3" WALL MOUNTED METAL PLATFORM 7'-6" |
| | AFF AND A WIND PRESSURE OF 96 PSF (ASD). THE |
| | ENGINEERING DRAWINGS ARE IN CONFLICT WITH THIS |
| | INFORMATION. THE APPROVED PLANS OR PROPOSED ENGINEERING |
| | WILL HAVE TO BE REVISED TO CORRECT THE DIFFERENCES AND |
| | REFLECT ACTUAL LOCATION OF THE PLAT FORM STAND. FBC |
| | 107.2.1 |
| | |
| | 5) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | |