| 2019-09-16 14:33:15 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) SHEET LS1.01 - THE DOOR TO BATHROOM # 2 OPENS OUT |
| | INTO THE EXIT CORRIDOR. THOUGH THIS IS NOT A VIOLATION |
| | INTO THE OPEN OFFICE SPACE, ONCE THE CUBICLE PARTITIONS |
| | ARE ADDED, THE CORRIDOR IS CREATED THAT RESTICTS |
| | EGRESS. |
| | |
| | PER NFPA 101 CHAPTER 7, MEANS OF EGRESS |
| | 7.2.1.4.3 DOOR LEAF ENCROACHMENT |
| | 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS |
| | OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE |
| | REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY, |
| | OR A LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT |
| | MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A |
| | CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN, |
| | UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET: |
| | (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN |
| | EXISTING BUILDING. |
| | (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS |
| | PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED |
| | WIDTH OF THE STAIR LANDING WHEN THE DOOR |
| | LEAF IS FULLY OPEN. |
| | |
| | PLEASE REVIEW AND CORRECT. |
| | |
| | |
| | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |