| 2019-10-04 12:00:52 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) COMPLIED |
| | |
| | |
| | |
| | 2) NOT COMPLIED |
| | |
| | THERE ARE NO INDICATIONS OF COMPLAINCE WITH ANY NFPA |
| | CODES. |
| | |
| | THE PROPOSED PROJECT SHALL COMPLY WITH, THE FLORIDA |
| | FIRE PREVENTION CODES AND ALL OTHER APPLICABLE CODES |
| | INCLUDING BUT NOT LOMITED TO: |
| | |
| | NFPA 110, NFPA 110, STANDARD FOR EMERGENCY AND STANDBY |
| | POWER SYSTEMS, 2013 EDITION. |
| | NFPA 37, STANDARD FOR THE INSTALLATION AND USE OF |
| | STATIONARY |
| | COMBUSTION ENGINES AND GAS TURBINES, 2015 EDITION. |
| | NFPA 58, LIQUEFIED PETROLEUM GAS CODE, 2014 EDITION. |
| | |
| | |
| | |
| | 3) NOT COMPLIED - NO DIMENSIONS ARE PROVIDED FROM THE |
| | PROPERTY LINE. |
| | |
| | THERE ARE NO INDICATIONS OF THE LP FUEL SUPPLY LOCATION |
| | AND OR SIZE ON THE PLAN SHEETS. |
| | |
| | PLEASE PROVIDE DETAILS, INCLUDING NEAREST BUILDINGS, |
| | PROPERTY LINES AND VEHICLE DRIVE PATHS |
| | |
| | |
| | |
| | |
| | 3A) NEW COMMENT - A LP TANK IS INDICATED. |
| | |
| | IS THIS AN UNDERGROUND OR ABOVEGROUND TANK. |
| | |
| | PLEASE PROVIDE DETAILS. |
| | |
| | |
| | |
| | |
| | 4) NOT COMPLIED - NO DIMENSIONS ARE PROVIDED |
| | |
| | FOR EXHAUST MIGRATION REVIEW, PLEASE PROVIDE THE |
| | DIMENSIONS AND LOCATIONS OF WINDOWS, DOORS, SOFFITS OR |
| | AIR INTAKE EQUIPMENT. |
| | |
| | |
| | |
| | 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |