| Date |
Text |
| 2019-09-12 17:07:08 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #19080808 |
| | 9/12/19 |
| | |
| | CODES IN EFFECT: |
| | |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE PROPOSED PROJECT HAS BEEN IDENTIFIED AS A CHANGE |
| | OF OCCUPANCY ACCORDING TO THE BUILDING REVIEW COMMENTS. |
| | PLEASE REFER TO SECTION1009.1 FBC EX AND PROVIDE |
| | MINIMUM VENTILATION CALCULATIONS FOR ALL ROOMS AND |
| | SPACES IN ACCORDANCE WITH TABLE 403.3.1.1 FBC M. |
| | PROVIDE A SCHEDULE ON THE PLAN THAT INDICATES BOTH THE |
| | REQUIRED AND THE "TO BE REQUIRED" CFMS OF OUTDOOR |
| | VENTILATION AIR. |
| | |
| | 2) THERE ARE NO MECHANICAL PLANS FOR THE PROPOSED |
| | PROJECT HOWEVER THE ARCHITECTURAL PLAN IS INDICATING AC |
| | SYSTEMS AND AN EXHAUST FAN IN THE NEW GARAGE. PLEASE |
| | PROVIDE MECHANICAL PLANS THAT CLARIFY IF THE AC SYSTEMS |
| | ARE NEW OR EXISTING, AND THAT SHOW ALL REQUIIRED |
| | ALTERATIONS TO THE EXISTING DUCTWORK TO ACCOMODATE THE |
| | CHANGE OF OCCUPANCY AND THE NEW ROOMS AND SPACES. |
| | |
| | 3) PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE |
| | GARAGE AND AN EXHAUST FAN SCHEDULE- SEE TABLE 403.3.1.1 |
| | FOR REQUIRED VENTILATION RATE, AND PROVIDE A SEQUENCE |
| | OF OPERATION FOR THE FAN ON THE PLAN. |
| | |
| | 4) THE NEW FAN OPENING IN THE EXTERIOR WALL SHALL BE |
| | IMPACT PROTECTED AND WIND RESISTANT IN ACCORDANCE WITH |
| | RULE 9N-03 FAC. PLEASE PROVIDE A MIAMI DADE NOA OR A |
| | FLORIDA PRODUCT APPROVAL FOR THE FAN OR FOR A LOUVER TO |
| | COVER THE FAN OPENING. |
| | |
| | 5) THE NEW BATHROOM SHALL BE MECHANICALLY VENITLATED IN |
| | ACCORDANCE WITH SECTION SECTION 1203.5.2.1 FBC B. |
| | PLEASE PROVIDE AN EXHAUST VENTILATION PLAN IN |
| | COMPLIANCE WITH TABLE 403.3.1.1 FBC M. |
| | |
| | 6) THE NEW KITCHEN SHALL HAVE AN EXHAUST VENTILATION |
| | SYSTEM SIZED AT A RATE OF 100 CFMS INTERMITTENT OR 25 |
| | CFMS CONTINUOUS. PLEASE INDICATE HOW COMPLIANCE WILL BE |
| | MET. |
| | |
| | 7) PROVIDE AN ENLARGED KITCHEN PLAN AND EQUIPMENT |
| | SCHEDULE- SECTION 107.2.1 FBC M. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |