| Date |
Text |
| 2019-09-25 16:42:02 | 1ST REVIEW: 19080773 |
| | 2017 FLORIDA BUILDING CODE 6TH EDITION |
| | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION |
| | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH |
| | EDITION |
| | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION |
| | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION |
| | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH |
| | EDITION |
| | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH |
| | EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHT. P-1.01 PLEASE LABEL BATHROOMS ON THE SANITARY |
| | ISOMETRIC DRAWING. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 2. SHT. P-1.01 THE LAVATORY IN THE POWDER ROOM SHOULD |
| | CONNECT TO THE TOILET DRAIN BEFORE CONNECTING TO THE |
| | BUILDING DRAIN TO CREATE A WET VENT SYSTEM. PER FBC RES |
| | P3108.1 |
| | |
| | 3. SHT. P-1.01 THE TOILET, SHOWER IN THE CABANA |
| | BATHROOM ARE NOT VENTED PROPERLY THE TOILET, LAVATORY |
| | AND SHOWER SHOULD CONNECT TOGETHER BEFORE CONNECTING TO |
| | THE BUILDING DRAIN THE LAVATORY SHALL CONNECT BETWEEN |
| | THE TOILET AND THE SHOWER TO CREATE A WET VENT SYSTEM. |
| | PER FBC RES P3108.2.1, P3108.1 |
| | |
| | 4. SHT. P-1.01 THE BAR SINK IN THE MORNING BAR ON THE |
| | 2ND FLOOR SHALL CONNECT DOWN STREAM OF THE BATHROOM |
| | GROUP. PER FBC RES P3108.2.1, P3108.1 |
| | |
| | 5. PROVIDE DETAIL OF SHOWER PANS SHOWING TYPE OF PAN |
| | MATERIAL AND PER PITCHED FLOOR SHALL COMPLY WITH FBC |
| | RES P2709.1 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |