| Date |
Text |
| 2019-08-16 14:24:46 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) THE LIFE SAFETY SHEET INDICATED INCORRECT EDITIONS |
| | OF MANY FIRE CODES. |
| | |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 6TH EDITION OF FLORIDA FIRE PREVENTION CODE WHICH |
| | INCLUDES THE 2015 EDITION OF NFPA 1 AND NFPA 101. |
| | |
| | THE CURRENT EDITIONS OF EACH CODE CAN BE FOUND IN NFPA |
| | 101, CHAPTER 2. |
| | |
| | THE BELOW LIST ARE THE MOST COMMON REFERENCED CODES: |
| | |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2013 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2013 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2013 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2013 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2014 EDITION. |
| | CLEAN AGENT SYSTEMS SHALL COMPLY WITH NFPA 2001, 2012 |
| | EDITION. |
| | EMERGENCY AND STANDBY POWER SYSTEMS SHALL COMPLY WITH |
| | NFPA 110, 2013 EDITION. |
| | COMMERCIAL COOKING SHALL COMPLY WITH NFPA 96, 2014 |
| | EDITION. |
| | FLAMMABLE AND COMBUSTIBLE LIQUIDS SHALL COMPLY WITH |
| | NFPA 30, 2015 EDITION |
| | MOTOR FUEL DISPENSING FACILITIES AND REPAIR GARAGES |
| | SHALL COMPLY WITH NFPA 30 A, 2015 EDITION |
| | AIR CONDITION WORK SHALL COMPLY WITH NFPA 90 A & B, |
| | 2015 EDITION |
| | INSPECTION, TESTING & MAINTENANCE SHALL COMPLY WITH |
| | NFPA 25, 2014 EDITION. |
| | |
| | |
| | PLEASE REVIEW, ENSURE COMPLIANCE AND UPDATE YOUR |
| | RECORDS. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |