| Date |
Text |
| 2019-11-06 16:09:28 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) THERE ARE NO INDICATIONS OF THE GENERATOR EXHAUST |
| | SYSTEM. |
| | |
| | PLEASE PROVIDE DETAILS IN COMPLIANCE WITH ALL |
| | APPLICABLE NFPA 110 AND 37. |
| | |
| | 7.10 EXHAUST SYSTEM. |
| | 7.10.1 THE EXHAUST SYSTEM EQUIPMENT AND INSTALLATION, |
| | INCLUDING |
| | PIPING, MUFFLER, AND RELATED ACCESSORIES, SHALL BE IN |
| | ACCORDANCE WITH NFPA37, STANDARD FOR THE INSTALLATION |
| | AND USE OF |
| | STATIONARY COMBUSTION ENGINES AND GAS TURBINES, AND |
| | OTHER APPLICABLE |
| | STANDARDS. |
| | 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO |
| | PREVENT |
| | EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR |
| | BUILDINGS |
| | AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT |
| | REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH |
| | WINDOWS, |
| | AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE |
| | SYSTEM. |
| | 7.10.3* EXHAUST PIPING SHALL BE CONNECTED TO THE PRIME |
| | MOVER |
| | BY MEANS OF A FLEXIBLE CONNECTOR AND SHALL BE |
| | INDEPENDENTLY |
| | SUPPORTED THEREAFTER SO THAT NO DAMAGING WEIGHT OR |
| | STRESS IS |
| | APPLIED TO THE ENGINE EXHAUST MANIFOLD OR TURBOCHARGER. |
| | |
| | |
| | PLEASE PROVIDE DETAILS. |
| | |
| | |
| | |
| | 2) THERE ARE NO INDICATIONS OF VENTILATION AIRFLOW. |
| | |
| | PER NFPA 110 |
| | |
| | 7.7 HEATING, COOLING, AND VENTILATING. |
| | 7.7.1* WITH THE EPS RUNNING AT RATED LOAD, VENTILATION |
| | AIRFLOW |
| | SHALL BE PROVIDED TO LIMIT THE MAXIMUM AIR TEMPERATURE |
| | IN THE |
| | EPS ROOM OR THE ENCLOSURE HOUSING THE UNIT TO THE |
| | MAXIMUM |
| | AMBIENT AIR TEMPERATURE REQUIRED BY THE EPS |
| | MANUFACTURER. |
| | |
| | 7.7.3 VENTILATION AIR SUPPLY SHALL BE FROM OUTDOORS OR |
| | FROM A |
| | SOURCE OUTSIDE THE BUILDING BY AN EXTERIOR WALL OPENING |
| | OR |
| | FROM A SOURCE OUTSIDE THE BUILDING BY A 2-HOUR |
| | FIRE-RATED AIR |
| | TRANSFER SYSTEM. |
| | 7.7.4 VENTILATION AIR SHALL BE PROVIDED TO SUPPLY AND |
| | DISCHARGE |
| | COOLING AIR FOR RADIATOR COOLING OF THE EPS WHEN |
| | RUNNING |
| | AT RATED LOAD. |
| | 7.7.4.1 VENTILATION AIR SUPPLY AND DISCHARGE FOR |
| | RADIATORCOOLED |
| | EPS SHALL HAVE A MAXIMUM STATIC RESTRICTION OF 125 PA |
| | (0.5 IN. OF WATER COLUMN) IN THE DISCHARGE DUCT AT THE |
| | RADIATOR |
| | OUTLET. |
| | 7.7.4.2 RADIATOR AIR DISCHARGE SHALL BE DUCTED OUTDOORS |
| | OR TO |
| | AN EXTERIOR OPENING BY A 2-HOUR RATED AIR TRANSFER |
| | SYSTEM. |
| | |
| | PLEASE PROVIDE DETAILS |
| | |
| | |
| | |
| | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |