| Plan Review Notes For Permit 19080670 |
| Permit Number |
19080670 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-10-01 13:09:01 | 1) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS | | | EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54, | | | NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND | | | 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES | | | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS | | | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT | | | THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. | | | SEC.G2408.1. 2ND REQUEST. | | | 2) SHOW THE LOCATION AND DISTANCE OF ANY OPERABLE DOORS | | | OR WINDOWS IN RELATION TO THE TANKLESS WATER HEATER. | | | THE LOCATION OF THE TANKLESS WATER HEATER SHALL COMPLY | | | WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE | | | HOUSE PLAN / FLOOR PLAN CAN BE HAND DRAWN. WPB AMEND. | | | TO FBC SEC. 107.2.1. 2ND REQUEST. | | | 3) A SEPARATE PERMIT IS REQUIRED FOR THE GAS | | | INSTALLATION. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | |
|