| 2020-10-02 08:56:23 | ** FAILED ** |
| | |
| | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| | APPLICABLE: |
| | |
| | 1.) PERMIT PLANS KEEP CHANGING TO SHOW INCONSISTENCIES |
| | WITH THE ZONING AND LAND DEVELOPMENT REGULATIONS |
| | (ZLDRS). FOR THIS PERMIT RESUBMITTAL, A NEW DRIVEWAY |
| | WAS ADDED (SEE "PROPOSED DRIVEWAY" IN PERMIT PLAN). PER |
| | ZLDR S.94-312(1), ONLY ONE DRIVEWAY AT A MAXIMUM WIDTH |
| | OF 20 FT. SHALL BE PROVIDED FOR A SINGLE-FAMILY |
| | RESIDENCE, AND AT LEAST 1,000 SQ. FT. OR 75% (WHICHEVER |
| | IS LESS) OF THE REQUIRED FRONT YARD SHALL REMAIN |
| | LANDSCAPED. [ZLDR S.94-482] |
| | |
| | 2.) DRIVEWAY EXTENSION MUST BE SET BACK AT LEAST 3 FT. |
| | FROM THE SIDE PROPERTY LINE. [NOTE: ERROR BY STAFF ON |
| | LAST REVIEW.] |
| | |
| | 3.) THE VALUE OF THE CONSTRUCTION FROM PERMITS |
| | TABULATED FOR THE YEAR EXCEEDS 50% OF THE STRUCTURE'S |
| | VALUE ($56,820) ACCORDING TO THE P.B.C. PROPERTY |
| | APPRAISER'S OFFICE; THEREFORE, PURSUANT TO SECTION |
| | 94-441(C)(2) OF THE ZONING AND LAND DEVELOPMENT |
| | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE |
| | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN |
| | ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO |
| | ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN |
| | DEMONSTRATING COMPLIANCE SHALL BE INCLUDED WITH THE |
| | PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO |
| | ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS |
| | PERMIT A SEPARATE LANDSCAPE PERMIT AND IRRIGATION |
| | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE |
| | SITE INTO CONFORMITY. |
| | |
| | [6/22/2020 REPEAT COMMENT: NOT ADDRESSED. NO RECORD OF |
| | LANDSCAPE PERMIT SUBMITTED. LANDSCAPE PERMIT SHALL BE |
| | SUBMITTED PRIOR TO ZONING APPROVAL OF PERMIT.] |
| | |
| | |
| | |
| | NOTES: |
| | |
| | * SEPARATE PERMIT REQUIRED FOR THE PROPOSED DRIVEWAY |
| | EXTENSION LEADING TO THE NEW 750 SQ. FT. ACCESSORY |
| | GARAGE STRUCTURE. DRIVEWAY PERMIT MUST BE SUBMITTED |
| | PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLETION |
| | FOR THE GARAGE STRUCTURE. ALTHOUGH A SEPARATE PERMIT IS |
| | REQUIRED FOR THE DRIVEWAY, THE PROPOSED DRIVEWAY MUST |
| | BE SHOWN IN THE PLANS AND MUST ALSO DEMONSTRATE |
| | CONSISTENCY WITH THE ZLDRS. |
| | |
| | * REVISIONS TO THE PLANS MAY RESULT IN ADDITIONAL |
| | COMMENTS. |
| | |
| | * DO NOT HESITATE TO CONTACT LINDA LOUIE @ (561) |
| | 822-1458 IF THERE ARE ANY QUESTIONS. |
| | |
| | * ZONE: SF7 |
| | |