| 2019-09-17 12:46:05 | PLUMBING COMMEMTS: APPROVED W/PROVISO |
| | |
| | 1. PER WPB FBC 107.2.1 AND 107.3.4.1, SUBMIT AS A |
| | DEFERRED SUBMITTAL CROSS SECTIONAL DETAIL OF SHOWER |
| | CONSTRUCTION SHOWING COMPLIANCE WITH FBC PL SECTION |
| | 417. BOTH SHOWERS SHALL SHALL BE RECONSTRUCTED TO |
| | COMPLY. SUBMITTAL SHALL BE SUBMITTED, APPROVED AND IN |
| | PLACE PRIOR TO FIRST PLUMBING INSPECTION. SEE WPB FBC |
| | 107.3.4.1 BELOW. |
| | A. REFER TO RED LINED COMMENTS ON PLAN SHEET P-1 |
| | |
| | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY |
| | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE |
| | BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED |
| | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF |
| | THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |