| 2019-08-15 15:24:03 | 08/14/2019 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE CLEAN OUT AT THE END OF THE SYSTEM NEEDS TO BE |
| | IN THE OTHER SIDE OF BUILDING AS A CLEAN-OUT REQUIRED |
| | AT THE BUILDING JUNCTION PER 2017 FBC RES. SEC. |
| | 3005.2.3 BUILDING DRAIN AND BUILDING SEWER JUNCTION. |
| | |
| | THE JUNCTION OF THE BUILDING DRAIN AND THE BUILDING |
| | SEWER SHALL BE SERVED BY A CLEANOUT THAT IS LOCATED AT |
| | THE JUNCTION OR WITHIN 10 FEET (3048 MM) DEVELOPED |
| | LENGTH OF PIPING UPSTREAM OF THE JUNCTION. FOR THE |
| | REQUIREMENTS OF THIS SECTION, REMOVAL OF A WATER CLOSET |
| | SHALL NOT BE REQUIRED TO PROVIDE CLEANOUT ACCESS. |
| | |
| | 2. IF THE SHOWER PAN IS NOT RECEDED AND NOT IN A |
| | CONTINUOUS POOR IT SHALL COMPLY WITH REQUIRE LINING PER |
| | 2017 FBC RES. SEC. 2709.2. |
| | |
| | 3. CITY OF WEST PALM BEACH ORD 2853-95 REQUIRES A |
| | BACKFLOW FOR A MULTI-DWELLING, BY A LICENSED CONTRACTOR |
| | WITH PERMIT APPLICATION INSPECTION AND CERTIFICATION |
| | FROM UTILITIES DEPARTMENT. |
| | |
| | 4. THERE IS A VALUE LISTED ON THE APPLICATION AND THE |
| | OVERALL VALUE IS LOW. WPB AMENDMENTS TO THE FBC 109.3 |
| | BUILDING PERMITS VALUATIONS. IF IN THE OPINION OF THE |
| | BUILDING OFFICIAL, THE CLAIMED VALUATION OF BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR |
| | PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |