| 2019-08-05 06:40:50 | 8/4/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| | COMMENTS NOTE - A COMPREHENSIVE REVIEW COULD NOT BE |
| | DONE AT THIS TIME AND ADDITIONAL PLAN REVIEW COMMENTS |
| | MAY BE GENERATED UPON THE RE-REVIEW OF SUBMITTED |
| | CORRECTIONS. |
| | |
| | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN |
| | DRAIN. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 2)THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| | CONTRACT. WPB AMENDMENTS TO THE FBC SEC.109.3 |
| | |
| | 3) INDICATE ON THE PLANS IF THE POOL IS EQUIPPED WITH |
| | AN AUTO-FILL. WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 4) ALL GAS AND SPA HEATERS SHALL HAVE A MINIMUM THERMAL |
| | EFFICIENCY OF 82 % FOR HEATERS MANUFACTURED ON OR AFTER |
| | APRIL 16, 2013, WHEN TESTED IN ACCORDANCE WITH ANSI Z |
| | 21.56. POOL HEATERS FIRED BY NATURAL OR LP GAS SHALL |
| | NOT HAVE CONTINUOUSLY BURNING PILOT LIGHTS. 2017 |
| | FBC-ENERGY ? SEC. R403.10.4 |
| | |
| | 5) HEATED SWIMMING POOLS AND IN GROUND PERMANENTLY |
| | INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT |
| | COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR |
| | OTHER MEANS PROVEN TO REDUCE HEAT LOSS. 2017 FBC- |
| | ENERGY- SEC. R 403.10.3 |
| | |
| | 6) TIME SWITCHES OR OTHER CONTROL METHODS THAT CAN |
| | AUTOMATICALLY TURN OFF AND ON HEATERS AND PUMPS |
| | ACCORDING TO A PRESET SCHEDULE SHALL BE INSTALLED ON |
| | ALL HEATERS AND PUMPS. HEATERS, PUMPS, AND MOTORS THAT |
| | HAVE BUILT-IN TIMERS SHALL BE DEEMED IN COMPLIANCE WITH |
| | THIS REQUIREMENT. 2017 FBC- ENERGY ? SEC. R 403.10.2 |
| | |
| | 7)WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION |
| | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | 8) WORK DESCRIPTION SHALL BE FILLED IN ON THE |
| | ELECTRICAL AND PLUMBING PERMIT APPLICATIONS |
| | |
| | 9) DESCRIPTION ON PERMIT SHALL STATE POOL RENOVATIONS |
| | |
| | 10) SEPERATE GAS PERMIT REQUIRED FOR THE GAS POOL |
| | HEATER |
| | |
| | 11) VAUUM LINE MISSING ON POOL PLUMBING FLAT DRAWING |
| | |
| | 12) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE POOL |
| | HEATER. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLANS EXAMINER |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |