| Date |
Text |
| 2019-09-05 17:16:36 | PLUMBING 1ST REVIEW**DENIED** |
| | 1-PLUMBING SUB PERMIT APPLICATION REQUIRED. FBC 107.1 |
| | 2-SHT. A0.04 LIST 1 OF THE TOILET DISPENSER DETAILS |
| | SHOWING THE MEASUREMENT (7?-9?) TO THE FRONT EDGE AND |
| | NOT THE CENTER. FBC-ACC 604.7 |
| | 3-SHT. A0.12 NOTE #18 UNDER ACCESSIBILITY CALLS FOR THE |
| | TOILET DISPENSER MOUNTING AS 12? FROM THE LIP OF TOILET |
| | AND NOT 7?-9? AS REQUIRED IN FBC-ACC 604.7 |
| | 4-SHT. A0.12 NOTE #21 UNDER ACCESSIBILITY CALLS FOR THE |
| | GRAB BAR MOUNTING ABOVE THE FLOOR AND NOT TO THE TOP OF |
| | THE GRIPPING SURFACE. FBC-ACC 606.5 |
| | 5-SHT. A0.12 NOTE #25 CALLS TO INSULATE THE HOT WATER |
| | LINE AND DRAIN LINE. THE COLD LINE IS ALSO REQUIRED. |
| | FBC-ACC 606.5 |
| | 6-TANKLESS WATER HEATER MUST BE CAPABLE OF PRODUCING A |
| | HEAT RISE TO PRODUCE HOT WATER (MIN 110F) WITH 2.2 GPM |
| | AND NOT THE .5GPM AS CALLED OUT. THIS WATER HEATER IS |
| | DESIGNED FOR BATHROOM LAVATORIES WHERE .5 GPM IS |
| | ACCEPTABLE. PLEASE PROVIDE A WATER HEATER THAT MEETS |
| | FBC-PLB 604.3, 607.1 |
| | 7-PROVIDE SHUT OFF VALVES AT THE COLD WATER DOWN FEED |
| | AND THE HOT WATER HEATER INLET. FBC-PLB 606.1 |
| | 8) SHOW ON PLAN THE CLEAR FLOOR SPACE IN FRONT OF THE |
| | SINK. FBC-ACC 606 |
| | 9) ADD HAMMER ARRESTORS OR PROVIDE NOTE THAT HAMMER |
| | ARRESTORS ARE TO BE USED ON ALL QUICK CLOSING VALVES. |
| | FBC-PLB 604.9 |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH ( CGA SOLUTIONS) |
| | [email protected] |
| | 561-248-2703 |
| | |