| Date |
Text |
| 2019-07-13 05:07:59 | 7/13/19 DENIED |
| | |
| | PLUMBING SHALL BE INSTALLED BY A LICENSED PLUMBING |
| | CONTRACTOR PER WEST PALM BEACH AMENDMENTS TO FBC 2017 |
| | 105.1 |
| | |
| | THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| | CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 107.2.1 PLEASE |
| | PROVIDE SCOPE OF WORK TO BE DONE |
| | |
| | THE ADJOINING WALLS AND FLOOR FRAMING ENCLOSING ON-SITE |
| | BUILT-UP SHOWER RECEPTORS SHALL BE LINED WITH ONE OF |
| | THE FOLLOWING MATERIALS: |
| | |
| | 1. SHEET LEAD. |
| | 2. SHEET COPPER. |
| | 3. PLASTIC LINER MATERIAL THAT COMPLIES WITH ASTM D4068 |
| | OR ASTM D4551. |
| | 4. HOT MOPPING IN ACCORDANCE WITH SECTION P2709.2.3. |
| | 5. SHEET-APPLIED LOAD-BEARING, BONDED WATERPROOF |
| | MEMBRANES THAT COMPLY WITH ANSI A118.10. |
| | |
| | THE LINING MATERIAL SHALL EXTEND NOT LESS THAN 2 INCHES |
| | (51 MM) BEYOND OR AROUND THE ROUGH JAMBS AND NOT LESS |
| | THAN 2 INCHES (51 MM) ABOVE FINISHED THRESHOLDS. |
| | SHEET-APPLIED LOAD-BEARING, BONDED WATERPROOF MEMBRANES |
| | SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER?S |
| | INSTRUCTIONS. |
| | |
| | NOTE: SHOWER PAN MUST HAVE A SLOPED MORTAR BED THAT IS |
| | PRE-PITCHED BENEATH PRIOR TO LINER INSTALLATION OF 1/4" |
| | IN |
| | PER FOOT TOWARD THE DRAIN, MUST HAVE DAM CORNER, |
| | BACKING |
| | AROUND THE PERIMETER AND BEFORE FINAL MORTAR |
| | APPLICATION |
| | PLACE SOME PEA GRAVEL OVER WEEP HOLES SO THE MORTAR |
| | DOES |
| | NOT COVER THEM PER MANUFACTURES SPECIFICATIONS. |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |
| | |
| | |
| | |
| | |