Plan Review Notes
Plan Review Notes For Permit 19070210
Permit Number 19070210
Review Stop G
Sequence Number 1
Notes
Date Text
2019-08-05 09:32:021) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON
 THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. YOU HAVE
 ONLY SUBMITTED ONE SPECIFICATION SHEET FOR EACH
 REGULATOR.
 2) THE APPLICATION NOTES THAT TIKKI TORCHES ARE TO BE
 INSTALLED YET THE TIKKI TORCHES ARE NOT SHOWN ON THE
 GAS DRAWING. THE TIKKI TORCHES SHALL BE SHOWN ON THE
 GAS DRAWING ALONG WITH THE LENGTH OF ALL PIPING AND THE
 PLAN SHALL CLEARLY SHOW THE LENGTH OF ALL CUT SECTIONS
 OF PIPE PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2.
 OR 2017 FBC-R SEC. G2413.4.1, G2413.4.2.
 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED FOR
 THE TIKKI TORCHES AND THE SECOND MOUSQUITO TRAP AND ALL
 PIPE SIZES. WPB AMEND. TO FBC SEC. 107.2.1.
 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
 5) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES.
 SEC. G 2413.4.1, G2413.4.2.
 6) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54,
 NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS
 FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT
 THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES.
 SEC.G2408.1.
 7) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS
 SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4.
 8) THE PLAN NOTES THAT TWO MOSQUITO TRAPS WILL BE
 INSTALLED BUT ONLY ONE IS SHOWN ON THE GAS DRAWING AND
 NOTED ON THE PERMIT APPLICATION. CLARIFY.
 9) SUBMIT A SURVEY/SITE PLAN SHOWING THE LOCATION OF
 THE MOSQUITO TRAPS AND ALSO THE TIKKI TORCHES.WPB
 AMEND. TO FBC SEC. 107.2.1.
 10) THE PLANS INDICATE AN EXISTING LP TANK AND CITY
 RECORDS SHOW AN EXISTING GAS SYSTEM FOR THIS ADDRESS.
 THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED
 INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE
 EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE
 EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM
 THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD
 OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO
 EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH
 OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. FGC SECS. 401.4,
 401.8, 402.1, 402.2, 402.3 OR FBCR SECS.G2412.4,
 G2412.8, G2413.1, G2413.2, G2413.3.
 11) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO ALL
 APPLIANCES. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1
 OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE
 PROPER PIPE SIZE AND BTU LOAD.
 12) SHOW THE DISTANCE FROM THE GAS METER TO THE MOST
 REMOTE REGULATOR ON THE SYSTEM.
 13) WHERE CONNECTED TO RIDGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE FOOT OF EITHER SIDE OF THE MP
 REGULATOR. 2017 FBC-FUEL GAS SEC. 410.2 (7).
 14) THE SUBMITTED MANUFACTURER'S SPECIFICATIONS FOR THE
 REGULATORS DO NOT CORRELATE WITH THE REGULATORS NOTED
 ON THE GAS DRAWING. CLARIFY.
 15) DOCUMENTS HAVE BEEN SUBMITTED FOR THE MAGNESIUM
 ANODE, ANCHORING OF THE UNDERGROUND LP TANK, AND TANK
 DATA SHEET. IF YOU ARE CONNECTING TO AN EXISTING LP
 TANK, WHY ARE THESE DOCUMENTS BEING SUBMITTED? CLARIFY.
 16)THE DOCUMENTS THAT HAVE BEEN SUBMITTED FOR THE LP
 TANK ANCHORING BEAR A COPIED ENGINEER'S SIGNATURE AND
 SEAL. DOCUMENTS THAT ARE BEING SUBMITTED FOR PUBLIC
 RECORD MUST BEAR THE ORIGINAL SEAL AND SIGNATURE OF THE
 ENGINEER PER THE FL. ADMIN. CODE RULE 61G15-23.001.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  